Laserfiche WebLink
-5- <br />23. THE APPLICANT S.Y.; LL 05 TA IN RIGHTS-OF-(i .?Y FROF1 BLh1 PRIOR TO THE CONSTRUCTION <br />OF OFF LEASE ROADS, TR~A'Sh17SSION LIIJES, WATER LINES, AND FACILITIES AND FOR <br />THIRD PARTY FACILITIES ON THE LEASES. <br />24. COFIPANY HAS NOT SL3MZTTED ADEQUATE INFORMATION ON F1ULE DEER AND ANTELOPE <br />h'IGRATION PROBLEMS THROUG.Y THE AREA OF DISTURBANCE. ZN ORDER TO DEVELOP <br />PROPER MITIGATION PLANS FOR THE PROTECTION OF THE INTEGRITY OF MIGRATION <br />ROUTES BRIEFLY IDENTIFIED IN BLM'S FINAL EIS ON THE F100N LAKE PROJECT, THE <br />FOLLO[PI1JG STIPULATION HAS BEEN DEVELOPED: THE APPLICANT F1UST SUBFfZT TO THE <br />REGULATORY AUTHORITY THE COhfPLETE STUD}' RESULTS FOR MULE DEER AND ANTELOPE <br />MIGRATION CONSIDERATIONS WITHIN 30 DAYS OF APPROVAL. THE REGULATORY AUTHORITY <br />IN CONSULTATION h'ITN STATE AND FEDERAL GAME MANAGEFIENT AGENCIES WILL DETERMINE <br />ADEQUATE MITIGATION PROCEDURES. <br />25. DUE TO POOR 4TEATHER CONDITIOIJS THE APPLICANT'S SURVEY FOR SAGE GROUSE <br />LEK ACTIVITIES WERE UA'SUCCESSFUL. A SURVEY IS BEING CONDUCTED IN SPRING OF <br />1981 TO DETERMINE IF ANY LEKS DO OCCUR IN THE AREA TO BE DISTURBED. THEREFORE, <br />BEFORE ANY EVALUATION CAN BE INITIATED THAT SURVEY MUST BE SUBMITTED. FIZTHIN <br />30 DAYS OF THE MINE PLAN APPROVAL, THE APPLICANT SHALL SUBMIT TO THE REGULATORY <br />AUTHORITY THE RESULTS OF THE LEK SURVEY AND WHAT MITIGATION PROCEDURES WILL <br />BE USED TO MINIIdIZE IMPACTS TO SAGE GROUSE AND TXEZR HABITATS. <br />26. ADEQUATE PROTECTION FOR ACTIVE GOLDEN EAGLE A'ESTS ADJACENT TO THE MINE <br />SITE MUST BE PROVIDED. THEREFORE, THE FOLLOWING DESCRIBED LANDS ARE CLASSIFIED <br />A1JD UNSUITABLE FOR_SURFACE DISTURBANCE AND OCCUPANCY. PERIODIC ACTIVITY DURING <br />Th'E NON-NESTING SEASON (JUNE 1 - FEBRUARY 28J WITHIN THE BUFFER ZONE CAN BE <br />APPROVED ON A CASE BY CASE BASIS: <br />FEDERAL LEASE D-047201 <br />T.2N., R.lOW., 6th PM <br />Sec. 3: S'ASE'? <br />Sec. 10: NEkNE11 <br />FEDERAL LEASE C-023703 <br />T.2N'. , R.10W. , 6th PM <br />Sec. 3: E'S SE1r SW?f <br />27. UP077 APPROVAL OF DEPARTFIEN TAL ACTION THE OPERATOR WILL SUBMIT h'ITN IN <br />30 DAYS PLANS FOR COIJSTRUCTIOIJ OF PO[•.BRLINES USING APPROVED GUIDELINES FOR <br />P.i,PTOR PROTECTIONJ, <br />28. L'^O:J APPROVAL OF DEPART.';ENTAL ACTION THE OPERATOR WILL COF1h1IT WITHIC <br />30 DA}'S TO NOT USING PERSISTENT PESTICIDES UNLESS APPROVED FY mvr nrGULA: ORY <br />AUTHORITY Al7D TO FENCE ANY PONDS THAT CONmA IN TOXIC hfATERIALS. <br />29. A STATE AIR QUALIT}' PERb17T IS REQL'ZRED BEFORE CONSTRUCTION AND OPERATION <br />CAN BEGIN. <br /> <br />