Laserfiche WebLink
- 3- <br />i4. 2NE APPLICANT P; UST PROVIDE THE REGL'LA TORT' AUTHORITIES WITH PLANS TO <br />RESIZE THE D-PORTAL AREA AND DP-I PRINCIPAL SPILLWA S' TO ALLOW A FfAXIPfUM <br />HEAD OF ONLY O1JE FOOT ABOVE THE RISER CREST OR PROS'IDE ADDITIONAL FREEBOARD <br />BETWEEN THE RISER CREST AND EMERGENCY SPILLWAY CREST. THE REVISED PLAN <br />SHOULD BE SUBMITTED !/ITHZN 90 DAYS OF PERMIT APPROVAL. <br />15. WITHIN 30 DAYS OF PERMIT APPROVAL, THE RPFLICANT SHALL COMMIT TO THE <br />REGULATORY AUTHORITY TO COMPLY WITH THE FOLLOWING REQUIREMENTS: <br />(a) TO ZMPLEPfENT SEDIMENT CONTROL PLEASURES PRIOR TO THE ONSET OF CONSTRUCTION <br />OF THE COAL TRRNSPGRT AND STORAGE AREA; <br />(b) TO PROVIDE EMERGENCY AND PRINCIPAL SPILLf/AY OUTLETS WITH APPROPRIATE <br />EROSION CONTROL PRIOR TO THE CONSTRUCTION OF SEDIMENT PONDS; <br />(c) TO PROVIDE BAFFLES ON EACH OF TXE REFUSE DISPOSAL AREA SEDIMENT PONDS <br />AS NECESSARY; <br />(d) TO PROVIDE QUARTERLY REPORTS TO REGULATORY AUTHORITIES AS REQUIRED BY <br />RULE 9.05.9(8) OF THE COLORADO REGULATORY PROGRAM; <br />(e) TO NOTIFY THE REGULATORY AUTHORITIES WITHIN FIVE DAYS AFTER ANALYTICAL <br />RESULTS OF SURFACE WATER SAMPLES INDICATE THP.T NONCOPfPLIANCE WITH PERMIT <br />CONDITION OR APPLICABLE STANDARD HAS OCCURED, AS REQUIRED BY RULE 9.05.13(2)(a)(ii) <br />OF THE COLORADO REGULATORY PROGRAM; <br />(f) TO REVEGETATE THE ALLWIAL WELL FIELD ACCESS ROAD TOPSOIL STOCKPILE AS <br />ScYJN zc pp•RCTIBLE AND PLAINTEIIANCE OF A COLLECTOR DITCH P.ND BERM AT THE BASE OF <br />THE PILES TO TRAP SEDIP;ElJT UNTIL THIS REVEGETRTION IS ACCOMPLISHED; AND <br />(c) TO CO.'•:PLY [tiITH TE1.IPOP.ARY CESSRT2O17 REGULATIOI/S (RULE 4.30.I). <br />16. WITH RESPECT TO VEGETATION RESRPIPLING IN THE 1981 FIELD SEASON, SITE 50 <br />(COLORRIYJ [/ILDRYE) AND ITS REFERENCE AREA WILL BE SAPIPLED FOR HERBACEOUS COVER <br />AND PRODUCTION. SITE 60 {JUNIPER) HILL BE SAMPLED FOR SHRUB DENSITY AND FOR <br />PRODUCTION. SITE 41 (SAGEBRUSH-GRASS) AND SITE 90 (GREASEWOOD-SAGEBRUSH) AND <br />CORRESPONDING REFERENCE SITES WILL BE SAMPLED FOR PRODUCTION. DATA SUMMARIES <br />AND STATISTICAL ANALYSES PfUST BE SUBMITTED TO THE REGULATORY AUTHORITY BY <br />OCTOBER 1, 1981. THIS SHALL APPLY FOR ALL SAMPLING CONDUCTED DURING 1981. <br />17. WITH RESPECT TO VEGETATION SAMPLING DURING TXE 1981 FIELD SEASON IN AREAS <br />TO BE DISTURBED BI' P.EFUSE DISPOSAL UNITS 1-4, THE 1JU1•[BER OF SAMPLE CLUSTERS <br />[;IT.~217 EACH LiGETRTIO;: TI'PE SHALL BE RS S?ECIFIED ON PAGE 29-7 0.- ILLUSTRATION <br />24. C0.'_4J SPOT: DI'dG PEFE?SN'CE ARc'AS PfUST ALSO BE SR1ipLED FOR APPLICABLE <br />-. =-.~:E?S. _.:_ SIZE R:.D LOCATIO.`J Or ~oO~OcrD RrrrRE1:CE SITES 1:'UST BE <br />SCB'~.'ITTED TO THE REGULATORS' RUTRORITI' WITHIN 30 DRYS OF APPROVAL. TN.E REFERENCE <br />r ~,; [:?: __*CH WILL REPRESENT TF.'E AREA PRES£NTLS' OCCUPIED BY TXE CHEATGR.;SS-ANNUAL <br />/?S G1,..,. -.:.-Y `~"S FE SPECIFIED. <br />18. DISTURBED ACREAGES OF EACH VEGETATION TYPE AFFECTED BY THE SITES MENTIONED <br />ON PAGE 24-8 SHALL BE CALCULATED AND SUBMITTED TO THE REGULATORY AUTHORITY WITHIN <br />30 DRYS OF APPROVAL. THE NUMBER OF SAMPLE CLUSTERS PEQUIRED WILL BE SET BY <br />THE REGULATORY AUTHORITY AT THAT TIPfE. A MRP INDICATING THE SIZE AND LOCATION <br />OF PROPOSED REFERENCE SITES SHALL ALSO BE SUBMITTED BY THE ABOVE DEADLINE. <br />