Laserfiche WebLink
Knight Piesold <br /> Mr. Robert Ernst, Geologist -5- April 29, 1998 <br /> United States Department of the Interior <br /> The plant site will then be reclaimed as specified in the approved POO. If the <br /> existing buildings are not sold and removed, the operator will remove the buildings <br /> and reclaim the site as approved in the POO. <br /> 6) Measures to be taken during extended periods of non-operation to maintain the <br /> area in a safe and clean manner and to reclaim the land to avoid erosion and other <br /> adverse impacts. <br /> In the event of extended periods of non-operation, erosion control measures will <br /> be installed as necessary to limit erosion from stockpiles, roads and pits. <br /> The Elkhead Joint Venture respectfully submits this modification to the approved POO for off-site <br /> processing of ore generated at the Joker Mine. Based on our conversation, the EA can be performed <br /> by the BLM or to expedite the process, can be conducted by an independent firm. If you require <br /> additional information to begin the Environmental Assessment process, please contact Mr. Bruce <br /> Cloud at (210-299-1 100) or Mr. Richard Weber at Knight Pi6sold (702-738-2265). <br /> Sincerely, <br /> Knight Pi/6sold LLC <br /> Richard A. Weber, M.Sc. <br /> Manager of Environmental Services <br /> Elko, Nevada <br /> RAW/cb <br /> cc: Bruce Cloud, Elkhead Joint Venture <br /> Christina Kamnikar, Division of Minerals and Geology <br /> Carl Mount, Division of Minerals and Geology <br /> Jonathan Schnal, Carbon County Planning Director <br />