Laserfiche WebLink
Midterm Review <br />Eastside Mine <br />C-1984-063 <br />Introduction <br />This document presents the results of a midterm review conducted by the Division of Minerals <br />and Geology of the Eastside Mine permit. This review was conducted to fiilfill the requirements <br />of Rules 2.08.3 and 3.02.2(4). The permit is in compliance by exception with Rules 2.06.2 <br />through 2.06.7(5). <br />Rule 2.08.3 requires that the Division of Minerals and Geology (Division) conduct a review of <br />each permit issued, prior to its midterm. Based on this review, for good cause shown, the <br />Division may require reasonable revisions or modifications of the permit provisions to ensure <br />compliance with the Act and Regulation (Rule). <br />Rules 2.06.2, 2.06.3, 2.06.4, 2.06.5, 2.06.6, and 2.06.7 require that experimental practices, <br />mountaintop removal variances, steep slope mining, variances from approximate original contour <br />(AOC) for steep slope mining, prime farmlands, and variances from contemporaneous <br />reclamation for combined mining operations, respectively, be reviewed by the Division where <br />applicable during the Midterm Review. None of these activities are incorporated in this permit. <br />Rule 3.02.2(4) requires that the Division review the amount of the bond and the terms of <br />acceptance of the bond every 2'/z years. <br />This Midterm Review consists of a review of the Eastside Mine permit application and the <br />Permit Renewal RN-03 Findings Document to identify items that may need updating since the <br />permit renewal was approved. The Division also reviewed all subsequent revisions and <br />stipulation responses to ensure that all permit commitments and conditions were being followed. <br />Problems and observations from past inspection reports were also considered. <br />Table cf Contents <br />Introduction ..................................................................................................................................... 2 <br />Section I -History .......................................................................................................................... 3 <br />Section II -Revisions to the Permit ............................................................................................... 3 <br />Section III -Notices of Violations and Stipulations to the Permit ................................................. 3 <br />Section IV -Midterm Review and Adequacy Questions ............................................................... 3 <br />Rule 1 General Provisions .......................................................................................................... 4 <br />Rule 2 Permits ............................................................................................................................. 4 <br />Rule 3 Performance Bond Requirements .................................................................................... 6 <br />Rule 4 Performance Standards .................................................................................................... 7 <br />2002 Midterm Review <br />Page 2 of 8 Pages <br />