Laserfiche WebLink
of the loadout area bond, or $26,980.00. The remaining $17,988.00 for the loadout is sufficient to <br />assure completion of the remaining reclamation work at the site if the work had to be performed by <br />the Division, including the cost of reestablishing vegetation on any revegetated areas, should those <br />areas fail. <br />Reclamation work which remains to be done at the loadout includes removal of the sedimentation <br />ponds. Topsoil has been redistributed on all of the regraded loadout area, and the area was seeded in <br />January 1997, but liability for these tasks has not yet been released. <br />Any person with a valid legal interest which might be adversely affected by this proposed decision may <br />request a formal public hearing before the Mined Land Reclamation Board in accordano: with Section <br />3.03.2(6). Public notice of this proposed decision will be published twice in the Canon City Daily <br />Record as soon as possible. Requests for public hearing must be submitted to the Division in writing <br />within thirty days of the first publication in the Daily Record. If no hearing is requested within that <br />thirty days, the Division's decision will become final. <br />Sowhfield Mine Phase 1 [fond Release Pagc 5 <br />