Laserfiche WebLink
<br />1. If, during an inspection by MLRD it is found that a pond is no longer <br />dewatering properly due to the accumulation of sediment, the Division may <br />require the operator to remove the sediment from the pond to restore <br />the dewatering capability. <br />2. The applicant shall monitor the existing fire protection well according to <br />the requirements listed in the monitoring stipulation of this document. <br />3. Within 90 days of permit issuance the applicant shall submit an acceptable <br />plan to install a spoil well in Pit B to monitor spoil water quality and <br />quantity. <br />4. [Dater Monitoring Requirements: <br /> Table 1 Table 2 <br />Location I.D. No. Requirements Requirements <br />Ennis Draw <br /> DH-96 Monthly Quarterly <br /> DH-122 Monthly Ouarterly <br /> FPW Monthly Quarterly <br />Overburden <br /> DX-133 Monthly Annually <br /> DX-172 Monthly Semi-Annually <br />Spoil Well <br /> Proposed Well Monthly Semi-Annually <br />Coal <br /> DN-137 Monthly N/R <br /> DH-6I Monthly N/R <br />Foxhills <br /> Keenesburg No. 1 N/R N/R <br /> Keenesburg No. 2 N/R N/R <br />Note: <br />1. N/R = Not Required. <br />2. All results to be submitted quarterly. <br />TABLE 1 <br />Monitoring Requirements <br />A. Water Level (elevatidn above mean sea Level) <br />B. pX (field) (standard units) <br />C. Conductivity (field) (at 25 degrees in umhos/cm) <br />D. Temperature (field) (degree Celsius) <br />TABLE 2 <br />Monitoring Requirements <br />Total Dissolved Solids Potassium <br />Total Hardness Sodium <br />Sodium Adsorption Ratio Sulfate <br />Bicarbonate Aluminum <br />Calcium Boron <br />Chloride Copper <br />Fluoride Iron <br />Magnesium Lead <br />Ammonia Manganese <br />Nitrate <br />Phosphate Zinc <br />Note: Values should be reported as mg/1 where appropriate. All major ions <br />and trace metals to be analyzed for the dissolved ion concentration. <br />