Appendix 1 SL-04 Bond Summazy
<br />Estimated Cost Bond Held Reduction of Minimum Bond Comments
<br />of Remaining Required Bond Required
<br />Reclamation Amount
<br />
<br />$1,750,000 $1,750,000 $1,750,000 Initial estimate
<br />$804,300 $1,750,000 $945,700 $804,300 Liability
<br /> reduction
<br />$117,920 $1,750,000 $482,580 $321,720 SL-O1 Phase I
<br /> Bond Release,
<br /> 60% of $804,300
<br /> $804,300 Reduction of
<br /> bond held
<br /> (+$41,900) $363,620 RN-Ol
<br />$162,220 (+$29,380) $393,000 TR-08
<br /> $598,650 Reduction in
<br /> actual bond held
<br /> $393,000 Reduction in
<br /> actual bond held
<br /> $45,000 $348,000 SL-02
<br /> $77,267 $270,733 SL-03
<br /> $270,733 Reduction in
<br /> actual bond held
<br /> $114,145 $158,430 $234,570 Amounts
<br /> proposed in SL-
<br /> 04 application by
<br /> A licant
<br /> $95,612 Schedule
<br /> minimum See
<br /> Appendix 4 this
<br /> Findings
<br /> Document
<br /> $10,000 Minimum bond
<br />~ 3/10/88, TR-7
<br />Z 3/10/88, TR-7
<br />s 3/10183, TR-7
<br />° Rule 3.03.1(2)(b)
<br />s 3/9/88, SL-O1
<br />e 5/09/88
<br />10/04/88, TR-8
<br />e 10/04/88, TR-8
<br />9 10/04/88, TR-8 The decision document for TR-08 indicates an increase in required bond of $71,280. This is the
<br />sum of the $41,900 of Renewal 1 (RN-01) and the increase associated with TR-OH ($29,380).
<br />10 10/17/88
<br />~~ 11/23/88
<br />SL-04, C-81-025
<br />November 13 2001
<br />Page 1-1 of 2 Pages
<br />
|