Laserfiche WebLink
DEFICIT IS FOUND, EFCI NEEDS TO SUBMIT A PLAN TO MAKE UP THE <br />DIFFERENCE IN OVERBURDEN AND TOPSOIL. <br />2. FINAL DEPOSITION OF THE ON-SITE CONCRETE NEEDS TO BE CLARIFIED <br />IN THE PERMIT. <br />3. SHOULD EFCI WISH TO PURSUE AN ALTERATION FROM THE PRESENTLY <br />APPROVED POST-MINING CONTOURS AND CONFIGURATION AT THE <br />LOADOUT, THIS ISSUE NEEDS TO BE ADDRESSED IN A TECHNICAL <br />REVISION TO BE REVIEWED AND APPROVED BY THE DIVISION. <br />4. IN ORDER TO VERIFY FACILITY BACKFILL VOLUMES, THE OPERATOR <br />WILL PROVIDE AN ACCURATE CURRENT TOPOGRAPHIC/CONTOUR MAP WITH <br />APPLICABLE CROSS-SECTIONS TO REVISE MAPS 6 AND 7. <br />THE ABOVE ISSUES ARE TO BE RESOLVED IN A REVISION(S) TO BE <br />SUBMITTED WITHIN 60 DAYS OF PERMIT RENEWAL. <br />11 <br />