My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48878
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:26:22 PM
Creation date
11/23/2007 4:38:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
6/24/1994
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN2
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Status - Terminated <br />EFCI submitted Technical Revision 10 on July 1, 1991. The revision <br />was approved September 6, 1991 and the stipulation was terminated. <br />STIPULATION NO. 17 <br />WITHIN 120 DAYS OF PERMIT REVISION APPROVAL, THE APPLICANT SHALL <br />SUBMIT DESIGNS FOR THE MAGPIE CREEK CHANNEL IN COMPLIANCE WITH THE <br />REQUIREMENTS OF RULE 4.05.4. THE DESIGNS SHALL INCLUDE PLAN VIEWS, <br />LONGITUDINAL PROFILE, CROSS-SECTIONS AND CHANNEL PROTECTION DETAILS <br />IN ORDER TO MEET THE REQUIREMENTS OF RULE 4.05.4(4). <br />Status - Terminated <br />In a letter dated August 22, 1991, the operator, EFCI, requested <br />that the deadline for this stipulation be tied to the approval, <br />denial, or withdrawal of Technical Revision No.9. The Division <br />agreed and requested that EFCI submit designs within thirty days <br />following a decision on Technical Revision No.9 (TR09). TR09 was <br />officially withdrawn on October 16, 1992. In the Division's Mid- <br />term Review dated November 1992, adequacy question No.14 requested <br />a response to this stipulation. The requested designs, plan views, <br />longitudinal profile, cross-sections and channel protection details <br />were included in Technical Revision No.15, the response to the Mid- <br />term review. TR15 was approved on December 1, 1993. <br />STIPULATION N0. 18 <br />THE APPLICANT WILL SUBMIT TO THE DIVISION AN ANNUAL REPORT OF <br />INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WITHIN THE MINE. THIS <br />REPORT IS TO INCLUDE A MINE WORKINGS MAP SHOWING THE LOCATION AND <br />QUANTITY OF INFLOW; A TABLE KEYED TO THE MINE MAP WHICH SHALL <br />CONTAIN THE SOURCE (I.E. FAULT, FRACTURES, ETC.), QUANTITY, <br />DURATION AND QUALITY (I.E, pH, ELECTROCONDUCTIVITY AND TEMPERATURE <br />OF ALL INFLOWS; A TABLE CONTAINING RECORDS OF WATER DISCHARGED FROM <br />THE MINE, CONSUMED IN THE MINE AND IMPORTED FOR USE WITHIN THE <br />MINE; AND A DISCUSSION OF WATER BALANCE WITHIN THE MINE. THE <br />INFLOW STUDY IS TO BE DONE DURING THE SPRING OF EACH YEAR WITH THE <br />REPORT SUBMITTED BY AUGUST 1. <br />Status - Onooin4, in compliance <br />This stipulation was added to the permit September 11, 1991, with <br />the approval of Minor Revision 16, to coordinate the submittal of <br />the Annual Inflow Report with the submittal of the Annual Hydrology <br />Report. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.