Laserfiche WebLink
:` <br /> <br /> <br />-2- <br />In addition to these changes there are some on the around items which <br />will require additional responses. The first one is the occurrence of <br />seeps in the area below and downgradient from the Pond H-8 dam. H-G <br />should provide an explanation as to the occurrence of these seeps (i.e. <br />are they spoil springs or Pond related). Due to their Droximity to the <br />dam, there is concern about the seeps origin. <br />The second item involves noxious weed control on the reclaimed areas. <br />Minor Revision - 2 allowed H-G to use herbicides to control Canada <br />tnistle. From on-site observation it appears H-G has put forth <br />consideraole effort to control this weed. However, in addition to Canada <br />thistle other noxious weeds (most notably Dalmation toadflax) have been <br />ooserved on the mine site. H-G should include these and any other <br />noxious species in their weed control efforts. <br />II. Summary of Revisions <br />MR-2 - Use of herbicide to control Canada tnistle (submittal June 4, <br />1987) Action - approved June 8, 1987 <br />t4R-3 - Facility reclamation (submittea June 15, 1981) Action - approved <br />August 4, 1987 <br />MR-4 - modification of HG-8 discharge structure (submittea August 11, <br />1987) Action - approved August 17, 1987 <br />MR-5 - Western Ditch Hydraulics (suomitted August 11, 1987) Action - <br />approved August 21, 1987 <br />MR-6 - Elimination of mulching (submittea Octooer 22, 1987) Action - <br />approved November 2, 1987 <br />TR-53 - Elimination of wood density (submitted August 17, 1987) Action - <br />approved with conditions October 26, 1987. Revised pages have not been <br />suomitted to the Division. <br />TR-55 - Ground water monitoring plan (submitted September 3, 1987) Action <br />- approved February 1, 1989 <br />TR-56 - Modification of surface water monitoring (suomitted December 7, <br />1988) Action - approved February 1, 1989 <br />Status of Stipulations <br />Stipulation No. 3 - Evaluation of Groundwater monitoring and revised <br />9rounawater monitoring plan. <br />Status - Resolved (10/8/87) via TR-55 which revised the Groundwater monitoring <br />plan and replaced two wells. <br />