Laserfiche WebLink
however, it does not satisfy the monitoring requirements of Rule <br />2.05.6(6)(c). In order to verify the subsidence predictions contained <br />within the predictive sections of the amended application, a survey <br />cross - sectional profiling system will have to be established, preferably <br />above the earlier developed room- and - piller and longwall sections of the <br />mine. The results from this subsidence monitoring program should allow <br />amendment of the plan, if it is deemed appropriate. <br />-20- <br />