revegetation standards for Phase II release were not being met at the mine site, Kaiser Resources, <br />on September 17, 1993 requested withdrawal of the Phase II Bond Release request. <br />On September 19, 1993, the Division proposed approval of Permit Revision No. 1. Final approval <br />occurred on October 1 , 1993 following the end of the public comment period. <br />On October 7, 1993, Kaiser Resources, Inc. submitted an application for permit renewal (RN-02). <br />Because the operator failed to submit the application by September 10, 1993, the Division, on <br />October 14, 1993, notified the operator that should the permit not be renewed by March 12, 1994, <br />the applicant would not be able to conduct mining operations past March 12, 1994 until the permit <br />was renewed by the Division. <br />On October 20, 1993, the Division for the application for permit renewal (RN-021 complete. On <br />December 20, 1993, the Division received the operator's proof of publication. On January 31, <br />1994, the Division received a request from Kaiser Resources to extend the decision due date of the <br />Division review from February 1, 1994 to April 1, 1994. On March 14, 1994, the Division pro- <br />posed to approve the application for permit renewal, as the adequacy review conducted by the <br />Division found no issues of concern. <br />l/. Revisions to the Permit <br />No distinction was made between technical revisions and minor revisions with respect to sequential <br />numbering during the early years of this permit. Consequently, the first revision conducted was <br />Technical Revision No. 2, followed by Minor Revision Nos. 2, 3, and 4, followed by Technical <br />Revision Nos. 6 through 12. Following is a list of all revisions to the permit for Colorado Coal Mine <br />No. 1, with a description, action, and date. <br />Revision No. Description Decision Date <br />MR-02 Construct fence around pit area Approved 4109185 <br />MR-03 Replace culvert with dry crossing Approved 1 1 /13/87 <br />MR-04 Temporary reclamation seed mix Approved 11/10/87 <br />TR-02 Install diversion ditch Approved 4/09/85 <br />TR-06 Reduce hydrologic monitoring and relocate Approved 2/06/87 <br /> diversion ditch <br />TR-07 Revision as result of midterm review Approved 4/24/87 <br />TR-OS Reduce hydrology monitoring Approved 5/25/88 <br />TR-09 Revise reclamation plan Approved 1 /26/89 <br />TR-10 Suspension of hydrologic monitoring Approved 6/01 /89 <br />TR-1 1 Add sedimentation control pond Approved 3/08/90 <br />TR-12 Remove sedimentation control ponds A and B Approved 1 /22!92 <br />111. Status of Stipulations <br />This section summarizes the status of stipulations attached to the permit. Stipulations 1 through <br />19 are reiterated from the midterm review conducted in 1986. Stipulations 20, 21, and 22 are <br />taken from the 1989 Renewal Findings. <br />3 <br />