Laserfiche WebLink
STIPULATION NO. 13 <br /> SENECA COAL COMPANY SHALL PROVIDE PROOF OF RESOLUTION OF KENTUCKY <br /> CIVIL PENALTY VIOLATIONS AND BOND FORFEITURE ASSOCIATED WITH PERMIT <br /> 8980140 AS SOON AS IT BECOMES AVAILABLE. <br /> STATUS: Future. <br /> STIPULATION NO.14 <br /> APPROVAL OF MINOR REVISION NO. 13 FOR THE YOAST MINE IS CONDITIONED UPON <br /> THE RESOLUTION OF WEST VIRGINIA CESSATION ORDER NO. 13 ASSOCIATED WITH <br /> PERMIT NUMBER E012500 FOR THE MARTINKA COAL COMPANY. PROOF OF <br /> RESOLUTION SHOULD BE SUBMITTED TO THE COLORADO DIVISION OF MINERALS <br /> AND GEOLOGY AS SOON AS IT BECOMES AVAILABLE. <br /> STATUS: Future. <br /> STIPULATION NO. 15 <br /> WITHIN 180 DAYS OF PERMIT REVISION NO.1 APPROVAL AND PRIOR TO <br /> CONSTRUCTION OF POND 14, THE APPLICCANT SHALL SUBMIT A TECHNICAL <br /> REVISION TO THE YOAST PERMIT WHICH DEMONSTATES THAT POND 14 <br /> EMBANKMENT HAS A MINIMUM STATIC SAFETY FACTOR OF 1.5. THE STRENGTHS OF <br /> MATERIALS MUST BE DETERMINED, AND AN ANALYSIS WITH SITE-SPECIFIC <br /> STRENGTH PARAMETERS DEMONSTRATE A MINIMUM FACTOR OF SAFETY OF 1.5. <br /> STATUS: Future. <br /> Summary <br /> The Review Process <br /> Seneca Coal Company submitted an application for a new permit on November 16, 1994. The <br /> application was deemed complete on November 21, 1994, and notification of the complete <br /> application was sent to required entities (per Rule 2.7.3(3)(b)) the same day. A public notice of the <br /> application was published in the Hayden Valley Press once a week for four consecutive weeks <br /> beginning December 15, 1994. <br /> The Division transmitted preliminary adequacy review letters on January 20 and 23, 1995. <br /> On February 24, 1995, the Division requested compliance information from all other coal mining <br /> regulatory agencies in which the applicant and its controllers operate, to determine whether those <br /> yml Mine 6 October 19, 1999 <br />