Laserfiche WebLink
3. WHETHER MINING OPERATIONS WILL RESULT IN MATERIAL DAMAGE <br /> TO THE QUALITY OF SURFACE WATER SUPPLYING THE ALLUVIAL VALLEY <br /> FLOORS, AND <br /> 4. A MONITORING SYSTEM TO VERIFY THESE PROJECTIONS. <br /> STATUS: Complied with 10/15/99. Stipulation no. 9 has been satisfied by approval of PR-01. <br /> STIPULATION NO. 10 <br /> NO SURFACE COAL MINING OPERATIONS SHALL BE CONDUCTED ON FEDREAL LEASE <br /> C-0114093 UNTIL THE SECRETARY OF THE INTERIOR HAS APPROVED THE MINING <br /> PLAN. THE DIVISION RESERVES THE RIGHT TO MODIFY THE PERMIT, WHEN <br /> APPROPRIATE, IN ORDER TO RESOLVE CONFLICTS BETWEEN THE PERMIT <br /> REQUIREMENTS AND THE REQUIREMENTS OF OTHER LAWS, RULES, AND <br /> REGULATIONS ADMINISTERED BY THE SECRETARY OF THE INTERIOR. <br /> STATUS: Complied with. Stipulation No. 10 has been satisfied by the approval of the federal <br /> mining plan on 09/06/95. <br /> STIPULATION NO. 11 <br /> PRIOR TO INSTALLATION OF DRAGLINE DEADHEAD RAOD PERMANENT DRAINAGE, <br /> SENECA COAL COMPANY SHALL CONSTRUCT KEY CUTS ABOVE AND BELOW THE <br /> RECONSTRUCTED DRAINAGE TO THE MINIMUM SPECIFICATIONS OF Y DEEP AND 5' <br /> ACROSS THE WIDTH OF THE CHANNEL. SCC SHALL ALSO PLACE A GRANULAR <br /> FILTER LAYER OR GEOTEXTILE FILTER FABRIC IN THE ENTIRE RECONSTRUCTED <br /> DRAINAGE CHANNEL PRIOR TO PALCEMENT OF THE ROCK RIPRAP. <br /> STATUS: Complied with. Stipulation No. 11 was satisfied by construction of the required <br /> drainage amendments and approved on inspection on 01/15/97. <br /> STIPULATION NO. 12 <br /> SENECA COAL COMPANY SHALL SUBMIT A RECLAMATION PLAN IN THE FORM OF A <br /> REVISION FOR THE TOPSOIL PILES LOCATED AT THE YOAST MINE ENTRANCE HAUL <br /> ROAD BY OCTOBER 15, 1996. <br /> STATUS: Complied with 05/30/97. This stipulation was satisfied by the use of the topsoil and <br /> elimination of the pile in February 1997, and by approval of TR-05. <br /> Yoast Mine 5 Ocmber 19, 1999 <br />