My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-10-15_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
1999-10-15_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 5:08:40 AM
Creation date
11/23/2007 4:16:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
10/15/1999
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE FOR (PR1)
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATUS: Complied with. All of the permits listed above have been submitted and the <br /> stipulation has been satisfied. <br /> STIPULATION NO. 2 <br /> PRIOR TO CONSTRUCTION OF POND 11, SENECA COAL COMPANY MUST SUBMIT <br /> ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE BOND <br /> AMOUNT MUST BE APPROVED BY THE DIVISION. <br /> STATUS: Complied with 01/18/96. Stipulation No. 2 has been satisfied by submittal of TR-02. <br /> STIPULATION NO. 3 <br /> PRIOR TO CONSTRUCTION OF TOPSOIL PILE F, SENECA COAL COMPANY MUST <br /> SUBMIT ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE <br /> BOND AMOUNT MUST BE APPROVED BY THE DIVISION. <br /> STATUS: Complied with 10/21/97. Stipulation No. 3 was satisfied by the submittal of MR-I I <br /> which eliminated Topsoil Pile H and transferred the bonding liability associated with Pile H to Pile <br /> F. <br /> STIPULATION NO. 4 <br /> PRIOR TO RETENTION OF THE YOAST HAUL ROAD AS PART OF THE POST MINING <br /> LAND USE, A SIGNED CONSENT FORM FROM MANEOTIS SHEEP COMPANY MUST BE <br /> SUBMITTED TO THE DIVISION. <br /> STATUS: Complied with. Stipulation No. 4 has been satisfied by the submittal of a signed <br /> consent form dated 05/08/96, now contained within the permit document. <br /> STIPULATION NO. 5 <br /> WITHIN 180 DAYS OF PERMIT ISSUANCE AND PRIOR TO CONSTRUCTION OF POND 11, <br /> THE APPLICANT SHALL SUBMIT A TECHNICAL REVISION TO THE YOAST PERMIT <br /> WHICH DEMONSTRATES THAT POND 11 WILL BE LOCATED AS NEAR AS <br /> PRACTICABLE TO THE DISTURBED AREA, AND THAT THE POND EMBANKMENT HAS <br /> A MINIMUM STATIC SAFETY FACTOR OF 1.3. <br /> STATUS: Complied with 07/28/97. Stipulation No. 5 has been satisfied, the location acceptance <br /> documented in a letter dated 03/03/97 and the static safety factor satisfied by approval of TR-06. <br /> Yout Mine 3 October 19, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.