Laserfiche WebLink
<br />Memo to Berhan Keffelew <br />CC&VG "Misc. Procedures and Items" <br />page 3 <br /> <br />Ic) I assume you can provide Mr. Hardaway with a copy of the Division's <br />acceptance letter for the Phase II 1995 Certification Report. <br />14- Addition of a 12" Pipe Within the Drain Cover Fill <br />Apparently it has been discovered that the lower pipeline gradient of the exhaust pipe <br />from the Phase II "High Volume Solution Collection System", will necessitate the <br />provision of additional pipeline capacity over and above that necessary in the Phase <br />I installation. It is fortunate that this realization occurred prior to completion of the <br />effected installation. <br />I have reviewed the submittals included as Attachment A and Attachment B to Mr. <br />Hardaway's letter, prepared by Golder & Associates. The evaluation of the required <br />pipeline sizing and the appropriate pipeline separation both appeared properly <br />completed. I recommend your acceptance and approval of this revision application. <br />cc: Bruce Humphries <br />Jim Stevens <br />Jim Dillie <br />Doc: CRESMISC.WP5 <br />JPIJP <br />