Laserfiche WebLink
<br />-7- <br />16. IN ORDE12 TO VERIFY THE ACCURACY OF THE POST-MINING TOPOGRAPHY <br />ANU THE VOLUMETRICS PRESENTED OIV TABLE IV-4b, THE UIVISIUN <br />DIRECTS EMPIRE ENERGY CORPORATION TO SUBMIT A DEMONSTRATION THAT <br />THE METHODOLOGY USED TO DETERMINE THE RECLAIMED CONFIGURATION IS <br />IN COMPLIANCE WITH RULE 4.14. THIS DEMONSTRATION SHALL BE <br />SUBMITTED WITHIN 45 DAYS OF PERMIT ISSUANCE. <br />l7. IN ORDER TO CONFIRM THAT THE PROPOSED POST-MItVING CONFIGURATION <br />HAS BEEN ACHIEVE U, THE DIVISION DIRECTS EMPIRE ENERGY <br />CORPORATION TO PROVIDE AN ANALYSIS OF THE POST-MINING SURFACE <br />UTILIZING APPROPRIATE SURVEYING TECHNIQUES PRIOR TO TOPSOIL <br />REAPPLICATION AND/UR REVEGETATION. <br />18. WITHIN 120 DAYS OF PERMIT ISSUANCE, THE UIVISIUN DIRECTS EMPIRE <br />ENERGY CORPORATION TU IDENTIFY ALL KE-CREATED DRAINAGES <br />ASSOCIATED WITH THE PROPOSED POST-MINING TOPOGRAPHY. THE <br />APPLICANT SHALL PROVIDE PLANS, A DISCUSSION OF THE CONSTRUCTION <br />ANU A DEMUNSTRATIUiVtiASEU UN THE RE-ESTABLISHED GRADE THAT THE <br />DRAINAGE WILL BE GEOMORPHICALLY STABLE. <br />19. THE UIVISIUN DIRECTS EMPIRE tNERGY CURPURATIOW TO AMEND MAP IV-2 <br />TU DEPIL'T THE EXISTING NNU PROPOSED BOUNDNRIES OF THE COAL <br />PROCESSING 'BASTE PILE HT THE EAGLE iVU. 5 AiVU N0. 9 MINE <br />COMPLEX. AMENDMENT OF MAP IV-2 SHALL BE CUt4PLETED IN ACCEPTNBLE <br />FORM iVU LATER THAW 30 JAYS FOLLOWING 15SUAiVCE OF THE PERMIT. <br />21. GIVEiV THE FACT THAT A SUFFICIENT HYDROSTATIC HEAD MAY BUILD UP <br />WITHLV THE COMPLETED LAGLE N0. 5 MINE WURKIiVGS TO CAUSE MINE <br />WATER DISCHARGES, THE UIVISIUN DIRECTS EMPIRE ENERGY CORPORATION <br />TU PROJECT THE HYDRAULIC HEAD WITHIN THE MINE AND DEVELOP A PLAN <br />TO SEAL MINE OPENINGS TO PREVENT DRAINAGE OF MINE WORKINGS TO <br />THE SURFACE. THIS PLAiV MUST SHOW THAT THE WORKIiVGS WILL BE ABLE <br />TO WITHSTAND THE EXPECTED HYDROSTATIC HEAD DEVELOPED WITHIN THE <br />EAGLE iVU. ~ MINE WORKINGS. THIS PLAiV SHALL BE SUBMITTED TU THE <br />DIVISION WITHIN UNE YEAR OF PERMIT ISSUAtVCE. <br />22. THE DIVISIUIV DIRECTS EMPIRE ENERGY CURPORNTIUN TO MUIVITOR THE <br />ELEVATION AND ORIENTATION OF ALL RESIDENCES EXISTING WITHIN <br />EMPIRE VILLAGE AIVU THE PRIVATE RESIDENCE LOCATED WITHIN THE NE <br />1/4 of the SE 1/4 OF SECTION 30 OF T6tV, R91W. THIS SURVEY <br />MONITORING SHALL BE COMPLETED QUARTERLY AiVD THE RESULTS INCLUDED <br />WITHIN THE SEMI-ANNUAL SUBSIDENCE MONITORING REPORT, TO BE <br />SUBMITTED IN ACCORDHNCE WITH RULE 2.U5.6(6)(c)(i)(E). <br />23. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUBMIT HN <br />AMEIVUEU SUBSIUEiVCE REPORT FORMAT, FUR USE iN COMPLETING THE <br />REQUIRED SEMI-ANNUAL SUBSIUEIVCE MONITORING REPORTS, AS REQUIRED <br />BY RULE 2.05.6(6)(c)(i)(E). IN AUDITION TO THE SURVEY DATA <br />SHEETS ANU MAPS THE AMENDED FORMAT SHALL INCLUDE, AT A MINIMUM: <br />(1) CROSS-SECTIUIVAL PLOTS PRUJECTcU ALONG THE LABELED MONUMENT <br />SERIES SECTION LINES; AiVD (Z) NARRATIVE REPORTS COMPARING THE <br />