My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48098
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:23:57 PM
Creation date
11/23/2007 4:05:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1987072
IBM Index Class Name
General Documents
Doc Date
8/6/2004
Doc Name
Proposed Decision & Findings of Compliance for SL2
From
Phase III /Final
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submittal of Bond Release Aaalication and <br />Comaleteness Determination by the Division <br />The Division received RMBT's bond release application SL-2 on February 12, 2004, and <br />found the application complete on April 30, 2004, after the Division received proof of <br />publication of the applicant's public notice. The completeness detennination was made in <br />accordance with Section 3.03.2(1)(d). <br />RMBT submitted the bond release application following the procedures described in the Act <br />and the Regulations. The application also utilizes the Division's Guideline Re a~g <br />Selected Coal Mine Bond Release Issues, dated April 18, 1995. <br />Public Notice <br />RMBT published notice of the bond release application in the Durango Herald once weekly <br />for four consecutive weeks, beginning on February 25, 2004. RMBT also notified <br />landowners within and adjacent to the mine permit azea, and other interested parties of the <br />application for bond release, as required by Section 3.03.2(1). <br />Bond Release Inspection <br />The Division conducted a bond release inspection on June 4, 2004. The Division's bond <br />release inspection report is on file at its Denver office. The site inspection was conducted <br />in accordance with Section 3.03.2(2). Tom Kaldenbach represented the Division. <br />Michael S. Savage of Savage and Savage represented RMBT. The Division had notified <br />property owners within and contiguous to the site, and the Office of Surface Mining, but <br />they did not attend the inspection. A representative from the Office of Surface Mining <br />participated in an oversight inspection of the site on June 22, 2004, as part of an on-going <br />oversight evaluation of off-site impacts. <br />Following the bond release inspection it became apparent that one of the property owners, <br />Kazen Hunzeker, had not been notified of the inspection. She was given the opportunity to <br />visit the site. During the Division's inspection on August 3, 2004, she visited the site and <br />examined the alluvial monitoring wells, former pond, and leach field on her lands in the Hay <br />Gulch valley, and indicated no objection to the Phase III release. <br />Technical Review <br />The Division reviewed technical aspects of RMBT's bond release submittal in order to <br />determine if the requested bond release is warranted. The review evaluated the methods that <br />RMBT used in gathering and processing the data in the bond release application. The review <br />considered the technical validity of the conclusions that RMBT presented in the application. <br />The Division also independently analyzed various hydrologic impacts. The Division then <br />compazed RMBT's conclusions and the results of the Division's independent analyses to the <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.