My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48056
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:23:50 PM
Creation date
11/23/2007 4:03:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989065
IBM Index Class Name
General Documents
Doc Date
6/1/1989
Doc Name
WINKLER LIGHT AGGREGATE QUARRY APPLICATION FOR MLR PERMIT DOUGLAS CNTY COLO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~J <br /> SBMIBIT 8 <br /> RECLAHATIOR PLAA <br /> The proposed recl amation of the Ninkler Quarry will be for <br /> rangeland as it is currently being utilized. The net result of <br /> mining will be to lower the top of the mesa from 10 to 20 feet. <br /> The net effect of this lowering will be barely visible to the <br /> surrounding area. Mining will not be done at the edge of the <br />' upland. A 3:1 h orizontal:vertical slope down into the pit <br /> setback from the edge of the mesa will leave the visual <br />' impression that the upland has been untouched. <br /> Reclamation will be done concurrently with the mining operation. <br /> Backfilling with ov erburden and topsoil will begin as each mining <br /> phase is completed. Final grading and shaping of slopes will be <br /> done immediately. Reseeding will be done either in early spring <br /> or late fall to al low maximum germination of the seed mix. A <br /> second reseeding will be done one year later on areas where <br />' seeding has failed to take hold. <br />Overburden and topsoil will be stockpiled separately. <br />Erosion control will be a very important part of reclamation work <br />throughout the life of the operation, affecting water quality, <br />' soil quality, revegetation, grading, and slope stability. <br />Following is a list of reclamation and erosion control techniques <br />available for use: <br />Contour Ridging <br />This technique employs a plow or disk to create a series of <br />trenches running perpendicular to the slope. The trenches reduce <br />slope length by catching and holding water, thus allowing it to <br />percolate into the slope. Spacing between the trenches and <br />' trench depth depends on the form of equipment used. Nind erosion <br />can also be reduced by contour plowing. The eoisture holding <br />capabilities of the ridging encourages seed germination. <br />' Diversion Terrace <br />A diversion terrace is a channel with a supporting ridge on the <br />' lower side constructed across the slope. It is used to reduce <br />slope lengths, break up concentrations of runoff, and to move <br />water to stable outlets at a non-erosive velocity. Channel <br />grades may be variable, with the allowable velocity for the soil <br />type and vegetative cover determining maximum grade. Haximum <br />channel side slopes for temporary diversion are 1:1 and 3:1 for <br />permanent ones. <br />E-1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.