Laserfiche WebLink
<br /> <br /> TABLE OF DSSTURBANCE <br /> Major Disturbance <br /> Mining, Crushed Stone 10.0 Acres . <br /> Stripping, Crushed Stone 10.0 Acres <br />' <br /> Mining, Cut Stone 6.0 Acres <br /> Stripping, Cut Stone 3.0 Acres <br />' Topsoil Stockpiles 1.0 Acres <br /> Overburden Stockpiles 3.0 Acres <br />' Major Disturbance Subtotal 33.0 Acres <br /> Moderate Disturbance <br />' Plant Sites: <br /> Crushing, Screening, Milling 7..0 Acres <br />' Concrete 4.0 Acres <br /> Asphalt 4.0 Acres <br />~ Cut Stone 5.0 Acres <br /> Access Roads 8.0 Acres <br />' Office, Scale, and Hashing 2.0 Acres <br /> Equipment Yard and Maintenance 2.0 Acres <br />' Moderate Disturbance Subtotal 32.0 Acres <br /> Minor Disturbance <br /> <br /> Seeding - Year 1 12.0 Acres <br /> Reseeding - Year 2 2.0 Acres <br />' Minor Disturbance Subtotal 14.0 Acres <br /> Total Disturbed Acreage 79.0 Acres <br />' <br /> The mining timetable for this project is market d ependent. The <br /> total time for Wining a ten acre parcel could range from 1 to 5 <br /> <br /> <br />years depending on the amount of material sold per year. <br />D-5 <br /> <br />1 <br />