Laserfiche WebLink
compliance with the equivalent Phase II criteria, an equivalent Phase II bond release was <br />approved for this area as well. An equivalent Phase II bond release is proposed in this decision <br />for the permanent Stoney Ridge Fan Shaft Road Bridge. As for Phase I, reclamation of the areas <br />of the four water-monitoring flume sites, the two water-monitoring piezometers, and removal of <br />signs and mazkers aze exempt from phased bond release liability periods; however, reclamation <br />bond is retained for the reclamation of these items, which could be eligible for a future final bond <br />release(s). Thus, under this proposed decision, the remaining 63.2 disturbed-area acres within the <br />current permit for the North Thompson Creek Mines and Loadout, including the 4.1-acre <br />Developed Water Resources azea, will have been granted Phase II bond release. <br />This proposed decision, SL-O5, proposes Phase III bond release for 58.9 acres of the remaining <br />63.2 disturbed-azea/affected-azea acres within the current Permit for the North Thompson Creek <br />Mines and Loadout. Under this proposed decision, reclamation bond is proposed to be retained <br />for removal of the mine water dischazge treatment systems in the 4.1-acre Developed Water <br />Resources postmining land use area, reclamation of 0.2 acres of four water-monitoring flume <br />bases and piezometers, and removal of Permit boundary identification signs and disturbed area <br />mazkers. The Division proposes, in accordance with pertinent rules, that these remaining 4.3 <br />acres will not be subject to the ten-year liability periods, or to the revegetation criteria, associated <br />with phased bond releases. Although no impacts from subsidence are known to exist, and no <br />reclamation task has been identified with retention of associated bond liability, the Division <br />proposes to also retain jurisdiction over areas of underground mine workings associated with the <br />Permit. <br />Acronyms and Abbreviations <br />Act Colorado Surface Coal Mining Reclamation Act (Title 34, Article 33, <br /> Colorado Revised Statutes of 1973) <br />Applicant Minrec, Inc. <br />Application J: E. Stover ~ Associates letter of April 34, 202,- Re: Minrec, inc., North <br /> Thompson Creek Mines Request for Final Bond Release Permit No. C-81- <br /> 025, as amended by J. E. Stover & Associates letter of October 29, 2002, <br /> same subject. The initial application identified the phase of the bond <br /> release requested as Final. However, fmal accomplishment of certain <br /> additional reclamation tasks has yet to be met, and the application was <br /> amended. During processing of the Application, Phase I and Phase II bond <br /> release was incorporated into the Application for some small elements of <br /> reclamation work. The application is considered as a Partial Phase I, <br /> Partial Phase II, and Partial Phase III bond release request. <br />CDMR Colorado Dischazge Monitoring Report <br />CDPHE Colorado Department of Health and Environment <br />Division Colorado Division of Minerals and Geology <br />OSM U.S. Department of the Interior, Office of Surface Mining Reclamation <br /> and Enforcement <br />SL-O5, C-81-025, Mazch 24, 2003 <br />Page 6 of 26 Pages <br />