Laserfiche WebLink
P - uK <br />backtilling was visually validated during the:lugusl 6, Z00'_ Phase III bond release w,-site <br />inspection. An example is the backtilling of the Stoney Ridge air shall portal (phoWgraph). <br />Findings of the docun,cnt rev,ew u,dicatal that grading rcyuirenunts of• the approved <br />ntilan,ation plan had been approved and Phase I bond had hecn released fix the work. Required <br />grading was visualh~ validated as accomplished during the Phase III bond release nn site <br />u,spection. f•..an,plrs :ue a ~Raded access road and the mine waste refuse pile (photographs). <br />Findings of the document revic,v indicated that drainage control of the approved reclamation <br />plan h:+d hecn approved and Phase I txmd had been released fir the work. An c~ample of such <br />drainage control is the riprap-protected Vorth "fhompson Creek channel across the reclaimed <br />Portal I area (photograph). <br />I'hasc II <br />Phase II work, as had hecn previously reported as accomplished. and for which I'hasc II bond <br />release had hecn erantod, was visually assessed dunng the an-site inspection. l he :application <br />included vegetation sampling data that demonstrated compliance with the requirements (or final <br />bond release. Revegetauon of reclain,cd areas appeared to be as described in the Application. No <br />SL-U5. C'-~1-025. March Z-1. 213 <br />Page I5 of '(, Pages <br />