My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47969
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:23:32 PM
Creation date
11/23/2007 3:58:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
General Documents
Doc Date
3/24/2003
Doc Name
Proposed Decision & Findings of Compliance for SL5
From
Partial Phase III
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P - uK <br />backtilling was visually validated during the:lugusl 6, Z00'_ Phase III bond release w,-site <br />inspection. An example is the backtilling of the Stoney Ridge air shall portal (phoWgraph). <br />Findings of the docun,cnt rev,ew u,dicatal that grading rcyuirenunts of• the approved <br />ntilan,ation plan had been approved and Phase I bond had hecn released fix the work. Required <br />grading was visualh~ validated as accomplished during the Phase III bond release nn site <br />u,spection. f•..an,plrs :ue a ~Raded access road and the mine waste refuse pile (photographs). <br />Findings of the document revic,v indicated that drainage control of the approved reclamation <br />plan h:+d hecn approved and Phase I txmd had been released fir the work. An c~ample of such <br />drainage control is the riprap-protected Vorth "fhompson Creek channel across the reclaimed <br />Portal I area (photograph). <br />I'hasc II <br />Phase II work, as had hecn previously reported as accomplished. and for which I'hasc II bond <br />release had hecn erantod, was visually assessed dunng the an-site inspection. l he :application <br />included vegetation sampling data that demonstrated compliance with the requirements (or final <br />bond release. Revegetauon of reclain,cd areas appeared to be as described in the Application. No <br />SL-U5. C'-~1-025. March Z-1. 213 <br />Page I5 of '(, Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.