Laserfiche WebLink
<br />-3- <br />Section II - Revision to Permit <br /> <br />Since the permit has been issued, several revisions have been approved. <br />are as follows: <br />1. Technical Revision, Northgate Loadout. <br />Submitted - October, 1982 <br />Approved - August, 1983 with two stipulations <br />2. Technical Revision, Incorporation of Blasting Program. <br />Submitted - November, 1983 <br />Approved - December, 1983 <br />Both revisions have been incorporated into the permit document. <br />Section III - Status of Stipulations <br />Stipulation No. 1 - Oxidized coal disposal plan <br />Status - Resolved, March 1983 <br />Stipulation No. 2 - Suitability of soil <br />Status - Resolved, April 1983 <br />Stipulation No. 3 - Shrub density data for grassland vegetation <br />Status - Resolved, March 1983 <br />Stipulation No. 4 - Species diversity success standards <br />Status - Resolved, November 1983 <br />Stipulation No. 5 - Biennial revegetation monitoring plan <br />Status - Resolved, November 1983 <br />Stipulation No. 6 - Swell factor analysis and verification <br />Status -Resolved, December 1983 <br />TR Stipulation No. 1 - Bond submittal for Loadout <br />Status - Resolved, September 1983 <br />They <br />TR Stipulation No. 2 - Revegetation success criteria for Northgate Loadout <br />Status - Resolved, December 1983 <br />No stipulations remain unresolved as part of this permit. <br />Section IV - Bonding <br />The Division reviewed both the bonding calculations and the form of the bond. <br />A new bond amount has been calculated based upon current Blue Book rental <br />rates and operating costs. The revised costs are enclosed as Appendix 1. The <br />bonding information will be kept confidential. Walden Coal Company will be <br />required to submit a revised bond in the amount of $1,211,685.00. As <br />requested in the original permit application all bonding cost estimates will <br />be kept confidential. <br />