Laserfiche WebLink
<br />-10- <br />Stipulation No. 27 <br /> <br />WITHIN 12 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT, AS A <br />REVISION, AN AP PROVABLE PLAN FOR RECLAMATION OF THE ROAD SYSTEM TO THE <br />DIVISION. THIS PLAN MUST DELINEATE WHICH ROADS, IF ANY, WILL BE KEPT AS <br />PART OF THE POST-MINING LAND USE AND JUSTIFICATION FOR THEIR RETENTION. <br />Stipulation No. 28 <br />THE PERMITTEE SHALL PERFORM A SURVEY OF THE FIVE POTENTIALLY AFFECTED <br />ADOBE CONSTRUCTED HOUSES ON A QUARTERLY BASIS, IN CONFORMANCE WITH THE <br />REQUIREMENTS OF RULE 2.05.6(6)(c)(i)(D). <br />Stipulation No. 29 <br />THE PERMITTEE SHALL COMPLETE AN ANALYTICAL PILLAR STABILITY CALCULATION <br />FOR THE PROJECTED LIMITED EXTRACTION CONFIGURATION CONTAINED WITHIN THE <br />AMENDED APPLICATION FOR THE MAXWELL MINE. THESE ANALYTICAL <br />CALCULATIONS, PREPARED IN ACCORDANCE WITH AN ANALYTICAL METHOD <br />ACCEPTABLE TO THE DIVISION, SHALL BE SUBMITTED TO THE DIVISION FOR <br />REVIEW WITHIN 60 DAYS FOLLOWING PERMIT ISSUANCE. <br />