Laserfiche WebLink
<br />-9- <br />Stipulation No. 22 <br /> <br />WITHIN 120 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL SUBMIT A REVISED <br />BACKFILLING AND GRADING PLAN, INCLUDING A REVISED CONTOUR MAP AND <br />CROSS-SECTIONS OF THE POST-MINING TOPOGRAPHY. THE PROPOSED POST-MINING <br />TOPOGRAPHY SHALL COMPLY WITH THE REQUIREMENTS OF APPROXIMATE ORIGINAL <br />CONTOUR AND SHALL ELIMINATE ALL DEPRESSIONS. IN ADDITION, THE REVISED <br />CROSS-SECTIONS SHALL SHOW THE PRE-MINING TOPOGRAPHY. THIS PLAN WILL 8E <br />SUBMITTED AS A REVISION TO THE PERMIT. <br />Stipulation No. 23 <br />WITHIN TZO DAYS OF PERMIT APPROVAL, THE PERMITTEE MUST EITHER; A) SUBMIT <br />A PLAN TO THE DIVISION FOR DEMONSTRATING THAT SUCCESSFUL REVEGETATION <br />CAN BE ACHIEVED WITH•LESS THAN FOUR FEET OF THE BEST AVAILABLE <br />NON-TOXIC, NON-COMBUSTIBLE COVER MATERIAL; OR B) SUBMIT A PLAN FOR <br />RECLAMATION OF THE WASTE DISPOSAL PILE USING FOUR FEET OF THE BEST <br />AVAILABLE NON-TOXIC, NON-COMBUSTIBLE COVER MATERIAL. THIS PLAN MUST <br />INCLUDE A DESCRIPTION OF THE FOUR FEET OF COVER MATERIAL TO BE USED <br />INCLUDING, AT A MINIMUM, SOURCE AND GEOCHEMICAL CHARACTERISTICS. <br />EITHER PLAN WILL BE SUBMITTED AS A REVISION, SUBJECT TO APPROVAL BY THE <br />DIVISION AND WILL BE IMPLEMENTED BY THE PERMITTEE DURING THE RECLAMATION <br />OF THE PILE. <br />Stipulation No. 24 <br />WITHIN 30 DAYS OF PERMIT APPROVAL, THE PERMITTEE MUST SUBMIT EITHER A <br />PLAN TO BRING THE ACCESS ROAD INTO COMPLIANCE WITH THE CULVERT SPACING <br />REQUIREMENTS•OF RULE 4.03.2(4)(e)(V)(A) OR A REQUEST TO USE ALTERNATE <br />CULVERT SPACING SPECIFICATIONS IN ACCORDANCE WITH RULE 4.03.2(4)(e)(V). <br />IF THE PERMITTEE REQUESTS THAT ALTERNATE SPECIFICATIONS BE USED, THE <br />REQUEST MUST INCLUDE A DEMONSTRATION THAT THE ALTERNATE SPECIFICATIONS <br />WILL NOT RESULT IN INCREASED EROSION. EITHER PLAN WILL BE SUBMITTED AS <br />A REVISION TO THE PERMIT. <br />Stipulation No. 25 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST EITHER SUBMI7 <br />EVIDENCE TO THE DIVISION THAT THE EXISTING PURGATOIRE RIVER CULVERTS ARE <br />CAPABLE OF PASSING THE PEAK FLOW FROM A 20-YEAR, 24-HOUR PRECIPITATION <br />EVENT, OR SUBMIT A SCHEDULE, AS A REVISION TO THE PERMIT, ACCEPTABLE TO <br />THE DIVISION, FOR CONSTRUCTION OF THE PURGATOIRE RIVER BRIDGE. <br />Stipulation No. 26 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT APPROPRIATE <br />DESIGN INFORMATION PERTAINING TO THE ACCESS ROAD TO THE REFUSE PILE. <br />