Laserfiche WebLink
-~ <br />8. Before construction of the 4-inch water pipeline, the aesignated <br />operatorjlessee shall submit to the.Authorized Officer a construction plan <br />that shall include engineering/construction designs to be employed to <br />minimize the potential for pipeline ruptures and other problems as a <br />result of freezing, etc. <br />9. Culverts and/or other measures may be necessary to control surface water <br />runoff from the access road and adjacent areas so as not to impede natural <br />drainage or create erosional hazards. Placement and construction is <br />subject to direction and/or approval by the Authorized Ufficer. <br />10 <br />