Laserfiche WebLink
(3) OSMRE expressed concern about a portion of the proposed <br />facilities which the applicant had shown to be within the <br />100-year floodplain of East Salt Creek. The applicant remapped <br />the 100-year floodplain and showed that the proposed facilities <br />would not be located within it. <br />The public was notified of the availability of the PAP for review by <br />publication of newspaper notices for four consecutive weeks ending August <br />29, 1984. No public comments on the PAP were received after the public <br />notice was published. The public was notified of Colorado MLRD's <br />proposed decision to issue a permit in October 1985. <br />A technical analysis of the proposed mining and reclamation operations <br />was prepared by Colorado MLRD and was included in the documentation <br />provided by Colorado MLRD to OSMRE pursuant to the cooperative <br />agreement. The environmental assessment of the proposed action and <br />alternatives was prepared by OSMRE. These documents, other documents <br />prepared by Colorado MLRD, the company's PAP, and other correspondence <br />developed during the completeness and technical reviews are part of <br />OSMRE's administrative record. <br />A chronology of events related to the processing of the PAP is included <br />with this memorandum. <br />Written concurrence was provided by Bureau of Land Management, Branch of <br />Solid Minerals in a letter dated June 24, 1985; U.S. Fish and Wildlife <br />Service in a letter dated December 7, 1984; the State Historic <br />Preservation Officer in a letter dated April 11, 1984; and Bureau of Land <br />