north to the south side of the road, moving the water into apre-existing drainage Swale. <br />PROJECT MANAGER will mark the location of each low water crossing in the field prior to <br />construction beginning. <br />Specifications <br />The low water crossings shall be constructed to the specifications of Figure 1, Low Water <br />Crossing. The crossings will be constructed at about athirty-degree (30 °) angle to the axis of the <br />road, and will have a fall of five percent (5%) across the axis of each crossing. Ingress and egress <br />routes shall be no steeper than 6H: 1 V. The down hill slope of the crossings will be over filled to <br />accommodate anticipated volumes of water passing through the low water crossings. The <br />crossings shall be slightly longer than the width of the road above and below the crossing in order <br />to capture water from the ditch above each crossing, and in order to allow the water to move into <br />the pre-existing drainage Swale below each crossing. Durable rock shall be placed at the base <br />and on the sides of each crossing. The rock shall be placed as a blanket with a coarse of <br />screened one-inch (1") underlying a coarse of screened two-inch (2") rock. A course of clean four- <br />inch (4") rock shall be placed over the other two (2) courses at the base of the crossing. <br />Durable rock riprap shall be placed from the end of each low water crossing into the pre-existing <br />drainage Swale for a distance of thirty feet (30') below the end of each crossing. The rock placed <br />in the pre-existing shall consist of two-inch (2") screened rock, overlain by clean four inch (4") rock. <br />The rock shall be placed within these channels, which are approximately twelve inches (12") wide <br />at the base, and onto the side slopes for an additional twelve inches (12") per side, as measured <br />from the outside margin of the base of each channel. <br />Durable rock is defined as rock material which gives off a ringing sound when struck with a <br />hammer. <br />Measurement and Payment <br />Payment shall be made per low water crossing installed. Payment shall be made at the unit price <br />established in the Bid Schedule, Item 1. The unit price bid will cover all costs for excavation, and <br />rock placement per specifications. The price bid shall be considered full compensation for all <br />equipment and materials necessary and incidental to completing the low water crossings to the <br />specifications of this Task. Payment shall be as this Task is completed and approved by the <br />PROJECT MANAGER. <br />Task 2 Rolled Dip Construction <br />A rolled dip will be constructed on the Pits 2 / 3 Road approximately four hundred feet (400') above <br />the low water crossing completed during Task 1, above. This rolled dip will be constructed in order <br />to move water from the south to the north side of the haul road. This rolled dip will be constructed <br />to the specifications of Figure 2, Rolled Dip Construction. (NOTE: see facilities figure 3). <br />The dips will be constructed on an angle thirty degrees (30°) from perpendicular to the road <br />length. Excavated dirt shall be placed on the down slope side of the dip. The slopes of the dips <br />shall not be steeper than 5H: 1V. The depth of the ditch at the outlet as measured from the <br />downslope side of the road adjacent to the dip shall be two feet (2'). <br />Rock shall be placed within the rolled dip, including the base and the side slopes. The rock placed <br />