My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47703
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:23:01 PM
Creation date
11/23/2007 3:43:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
2/16/1994
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contemporaneous Reclamation - Rule 4.13 <br />/24. Division records indicate that the extension granted for spoil <br />p'Ir reclamation for both A and B pits has expired (see page 117 of <br />rP the permit). Therefore, the Division requests that Coors <br />submit an explanation for exemption from Rule 4.13 and include <br />a new variance date for contemporaneous reclamation. <br />Miscellaneous r,~ <br />25. A Stormwater Management Plan (SWMP) needs to be submitted for <br />the Keenesburg Mine site per 5 C.C.R. (Colorado Code <br />Regulations), 1002-2, Section 6.1.0. This may be accomplished <br />through applying for a general permit COG-8500 through the <br />Department of Health. For further information, please contact <br />Sarah Johnson in Water Quality Control Division, ph: 692-3609. <br />II. Summate of Revision and Permitting Activity <br />All permitting activity that has occurred in the last five years is <br />listed below. The brief description of the permitting actions <br />follows in chronological order. <br />Technical Revisions <br />i. Technical Revision 20: Submitted 1/5/89, approved with <br />conditions; Stipulation #26 on 02/28/89. <br />Backfilling of B Pit variance from 180 days for cell 4B. <br />2. Technical Revision 21: Submitted 5/30/89, approved 8/8/89 <br />Midterm Review. <br />3. Technical Revision 22: Submitted 7/21/89, withdrawn 8/89 <br /> Handled in TR 21; topsoil substitution. <br />4. Technical Revision 23: Submitted 10/26/89, approved 12/18/89 <br /> Inactivation of NPDES permit. <br />5. Technical Revision 24: Submittal 3/30/90, approved 4/30/90 <br /> Incidental boundary, access road right-of- way. <br />6. Technical Revision 25: Submittal 12/24/91, approved 1/28/92 <br /> Permit renewal issues. <br />7. Technical Revision 26: Submittal 6/2/92, a pproved 9/9/92 <br /> Sediment Pond 2; 25 yr/24 hr calculations. <br />8. Technical Revision 27: Submittal 4/14/93, approved 9/29/93 <br /> Mine boundary change; release of sections 26 & 35 of permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.