6. Powerlines, Power Poles and Guy Tdires <br />The portions of the electrical power distribution system for the <br />Sunlight mine which are to be removed by the CONTRACTOR are shown <br />on drawing sheets 1 and 2 of 9. Each drawing specifies which pole <br />and wire segments are to be removed, and which segments are to <br />remain in place. Removal of power and/or light poles shall include <br />the above grade portion of the wood pole or pole pairs, all <br />crossbars, braces, hardware, fixtures, other electrical components, <br />guy wires, and any other wires, cables, conduit, or other <br />materials affixed to the pole. Removal of the powerline wires or <br />cable shall include all wires or cable supported on, affixed to, <br />or otherwise connected to or associated with the powerline segment <br />specified for removal on the above referenced drawings. Poles <br />which can be accessed with appropriate equipment can be pulled out <br />intact if desired, otherwise the pole(s) shall be removed by <br />cutting at a maximum height of 4 inches above the existing ground <br />surface. All poles and wires located in undisturbed areas, <br />disturbed areas where shrub vegetation has become well established, <br />orareas where any earthwork is necessary in order to provide <br />mobile equipment access shall be removed without the use of any <br />equipment which will disturb the existing land surface or cause <br />damage to existing shrub vegetation. Non-salvaged items covered <br />under this specification shall be disposed of either by backstowing <br />within the inclined mine entry at a minimum distance of 50 ft. from <br />the surface, or by hauling to an approved landfill operation. The <br />main powerline pole containing the transformers shall be left in <br />place and not disturbed in any way; only the wires leading from the <br />main line to the mine and the remaining wires and poles indicated on <br />the attached drawings are to be removed. The CONTRACTOR is <br />responsible for contacting the utility company to ensure that power <br />to the mine has been disconnected and that none of the lines to be <br />removed are electrified. <br />4.3 Measurement and Payment <br />No measurement for payment shall be made for structural and electrical <br />utilities demolition and removal. Payment shall be for the lump sum bid <br />price established on the Bid Schedule for each bid item listed. The <br />price bid shall include all of the CONTRACTOR`S cost of whatever nature <br />to provide complete structural demolition and removal in accordance with <br />the plans and specifications, including demolition or dismantlement, <br />complete removal from the project site if salvaged, and on-site <br />underground disposal or hauling to and dumping in an approved landfill <br />site. <br />/ern <br />4843F <br />- 11 - <br />