Laserfiche WebLink
<br /> <br />(I) Has the Applicant proposed a backfilling and grading plan with <br />reasonable timetables that is consistent with good mining and <br />reclamation procedures? <br />(J) Has the Applicant proposed a plan to handle and dispose of refuse <br />in a manner that will control unsightliness? <br />(K) Is the proposed financial warranty amount set at a level that <br />reflects the estimated costs of completing the reclamation plan? <br />(L) Has the Applicant adequately addressed the requirements of <br />Construction Materials Rule 6.4 8 (wildlife information)? <br />Construction Materials Rule 6.4 10 (vegetative information)? <br />Construction Materials Rule 6.4.11 (climate)? <br />(M) Has the Applicant provided a description adequate to satisfy the <br />seeding and fertilization requirements of Construction Materials <br />Rule 6.4.5(2)(f)(ii) and (iii)? <br />(1V) Has the Applicant addressed secondary containment for hazardous <br />material and/or waste? <br />A. Adequacy ofApnlication to Determine Impacts to Surface and Groundwater <br />Systems and Impacts to Prevailing Hydrologic Balance <br />If an operation is expected to directly affect surface or groundwater <br />systems, Construction Materials Rule 6.4.7 requires an applicant to submit <br />information identifying the location of various water sources, all known <br />aquifers, a water management plan, projected water requirements and the <br />water sources to meet those requirements, and compliance with state and <br />federal water quality control laws. <br />