My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47468
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:22:35 PM
Creation date
11/23/2007 3:31:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
2/25/1994
Doc Name
GEC WEST PIT RECLAMATION
From
DMG
To
CORLEY CO
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />"' <br /> ~II ~~~II~~I~~~~~ ~I~ <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br /> <br />Deparlmenl o(Nalural Resources pF CO <br />s <br />0 <br /> ms <br />,; <br />p <br />~.: <br />' <br />o <br />131 3 Sherman 51., Room 215 ~ <br /> <br />Denver, C0 80203 ~: <br />• <br /> <br />Phone:(3031866-3567 ra~c <br />f A%:13031 832-8106 <br /> RoY Romer <br /> Governor <br /> M ¢hacl B Long <br /> Drvaion Dueaor <br />February 25, 1994 <br />Dr. W. D. Corley <br />The Corley Company <br />P.O. Box 1821 <br />Colorado Springs, CO 80901 <br />RE: GEC West Pit Reclamation <br />Dear Dr. Corley: <br />Since I have not been able to reach you by phone this week, I <br />wanted to notify you of the Division's plans for completion of the <br />GEC West Pit drainage improvements. The Division will be meeting <br />with Phil Kessler on the site during the second week of March to <br />discuss which of the two proposed drainage plans to implement and, <br />any necessary modifications to the first plan, should that plan be <br />selected. <br />As you know, the first plan follows concepts which you proposed to <br />the Division in 1993. The second plan was developed after <br />construction bids for the first plan were higher than anticipated. <br />In an August 26, 1993 letter to the Division, you indicated that <br />you thought an alternative to the first plan should be developed. <br />The Division forwarded those alternate plans and draft language for <br />modifying an earlier agreement between the Corley Company and the <br />Division regarding the first plan on October 26, 1993. Since that <br />time, the Division has solicited your comments or acknowledgement <br />of the revised agreement in writing on six separate occasions. <br />other than the comments in your October 29, 1993 letter (to which <br />the Division responded on November 8, 1993), we received no <br />acknowledgement of the proposed agreement until receipt of your <br />January 25, 1994 letter. <br />Your letter of January 25, 1994 stated, "We no longer wish to go <br />ahead with our suggested compromise". The "compromise" apparently <br />referred to the arrangements made in our December 21, 1993 meeting <br />in regard to the proposed revised agreement. Consequently, the <br />Division notified you that we would have Kessler Reclamation Co. <br />proceed with the original plan, as previously indicated in an <br />October 15, 1993 letter from the Division Director to the Corley <br />Company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.