Laserfiche WebLink
Oct • 18 . 2002 1 : 03PM No • 0266 P . 5 <br /> Ms. Julie Goettemoeller <br /> Lafarge Loveland Pit Substitute Water Supply Plan (DMG #M-2000-034) <br /> June 26, 2000 <br /> Lafarge - Loveland Pit (DMG#M-2000-034) <br /> MONTHLY DISTRIBUTION OF DEPLETIONS&REPLACEMENT REQUIREMENTS <br /> (All Values in Acre-Feet) <br /> Lagged Replacement <br /> Month Evaporative Water <br /> & Operational Required <br /> Depletions <br /> May 0.33 0.34 <br /> June 0.42 0.43 <br /> July 0.49 0.50 <br /> August 0.51 0.52 <br /> September 0.46 0.47 <br /> October 0.38 0.39 <br /> November 0.31 0.32 <br /> December 0.24 0.24 <br /> January 0.19 0.19 <br /> February 0.18 0.18 <br /> March 0.20 020 <br /> April 0.26 0.27 <br /> Total 3.97 4.05 <br /> Notes Replacement Water Required includes 2.0 percent transit loss from Loveland <br /> WWTP to the Loveland Pit site. <br />