Laserfiche WebLink
Oct • 18 . 2002 1 : 02PM No - 0266 P . 4 <br /> Ms. Julie Goettemoeiler <br /> Lafarge Loveland P", Substitute Water Supply Plan (DMG i#M-2000-034) <br /> June 26, 2000 <br /> This plan shall be valid through May 31, 2002, Acceptance of these conditions will be assumed <br /> unless a letter to the contrary is received by this office within two weeks after receipt of this letter. <br /> If this plan is not made absolute by a court action by the expiration date, a renewal of this plan is <br /> required. Please contact Megan Sullivan in Denver at (303) 866-3581 or Dave Nettles in Greeley <br /> at (970) 352-8712, if you have any questions concerning this approval. We conclude that approval <br /> of this plan does not imply a position by our office on any litigation associated with this case. <br /> Sincerely, <br /> Kenneth W. Knox <br /> Assistant State Engineer <br /> cc. Dave Nettles, Assistant Division Engineer <br /> Donald Brazeiton, Water Commissioner <br /> Richard Raines, Tuttle Applegate, Inc. <br /> Mark McLean, Rocky Mountain Consultants, Inc, <br /> KWWMASIm s c:loveland_doc <br />