Laserfiche WebLink
D. RESCREENING/CLABBIFYING - Not Applicable <br />Maximum tons screened per year <br />Maximum tons screened per hour <br />Hours of rescreening per day _ <br />Proposed controls (see above) <br />tons. <br />tons. <br />hours. <br />VII. CONVEYORS/TRANSFER POINTS <br />A. <br />Tons of material conveyed per year 800,000 tons, to stockpile:- <br />Tons of material conveyod per day 6,000 tons. <br />Proposed controls Partial enclosure <br />Controls for conveyors include: Full enclosure, partial enclosure, rn• <br />control, other (specify) <br />(INDICATE ON A SEPARATE DIAGRAM HOW CONVEYOR SYBTElS I8 SET DP) <br />8. TRANSFER POINTS <br />Number of transfer points 12 <br />Proposed controls Partial enclosure <br />Controls for transfer points include: Full enclosure, partia] <br />enclosure, water sprays, chemical suppressants, no controls, other <br />(specify) <br />