Laserfiche WebLink
D. LOADING OIIT FROM RAW MATERIAL BTOCICPILE: <br />Method of loading out (front-end loader, conveyor, etc.) <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total exposure, partial <br />exposure, moist material, other (specity) <br />vI. <br />Will processing (i.e., crushing, screening, etc.) occur on site? <br />^ Yes 0 No (check one) Not for coal stockpiles <br />NOTE: ALL PROCESS EQIIIPNENT REQIIZREB A SEPARATE PERMIT APPLICATION AND <br />APEN (SEPARATE FORM IS ATTACHED AT END OF THS FORK - MARE ADDITIONAL <br />COPIES AS NEEDED). <br />Material loaded into processing equipment by: <br />Conveyor Front end loader Other <br />CONTROLS FOR PROCESSING INCLIIDE: Moist or wet materials (specify <br />moisture ; if kno~-n), water spray bars, bag filters, other <br />(specify), no control. If existing processing equipment will be <br />relocated from another location complete the following sections. <br />This equipment must already be permitted. <br />(LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOW) <br />A. PRIMARY CRIISHING- Not Applicable <br />Maximum tons crushed per year <br />Maximum tons crushed per hour <br />Hours of crushing per day <br />Proposed controls (aee above) <br />B. <br />tons. <br />_ tons. <br />hours. <br />- Not Applicable <br />Maximum tons screened per year <br />Maximum tons screened per hour <br />Hours of screening per day <br />Proposed controls (see above)_ <br />C. SECONDARY CRIISHING - Not Applicable <br />Maximum tons crushed per year <br />Maximum tons crushed per hour <br />Hours of crushing per day <br />Proposed controls (see above) <br />tons. <br />_ tons. <br />hours. <br />tons. <br />tons. <br />hours. <br />S <br />