Laserfiche WebLink
<br />H. FINISHED PRODIICT TRANSPORT (ON SITE) <br />1. Haul Trucks <br /> <br />CAPACITY EMPTY <br />WEIGHT NO. OF <br />TRUCKS NO. OF <br />WHEELS NO. OF TRIPS <br />PER/DAY AVG. SPEED <br />ON SITE <br />1. 27 Yds. 31 000 2 18 ` 10 mph <br />2. Yds. mph <br />3. Yds. mph <br />4. Yds. mph <br />* From coal stockpiles to damp station. <br />2. Haul Road Information For Final Transport <br />1000 (/1 <br />On site haul roads distance (oaa way) 1200 N2 to dump station <br />Haul road silt content (if known) 3. <br />List controls for final transport: (see control measures) <br />Proposed controls: Water 2-3 times/dav, chemical stabilization. <br />C. OTHER ROADS ON-BITE - Not Applicable <br />WHAT IS ROAD <br />USED FOR? LENGTH OF <br />ROAD? (DISTANCE) <br />FROM TO <br />CONTROLS (SEE PAGE 9) <br />1. <br />2. <br />1. <br />9 <br />