Laserfiche WebLink
IX. VEHICLE HADL ROADS <br />CONTROL OPTIONS FOR VEHICLE HAIIL ROADS <br />(DO NOT 1fRITE IN TSIS 8ECTION) <br />1. Watering (spacily) times/day, to maintain moist surface. <br />2. Chemical stabilization <br />(according to~manufacturer's specifications) <br />Specify: <br />a. Frequency of application and <br />b. Type of stabilizer (brand name, or composition) <br />3. Paving to be completed by <br />4. Gravel <br />(date). <br />(LIST HAIIL ROAD CONTROLS IN THE APPROPRIATE SPACES HELOA) <br />A. TRANSPORT OF RAF MATERIAL FROM REMOVAL BITE TO STOCKPILE <br />Distance (one rap) <br />If stockpile is off site, give distance <br />entrance <br />Haul vehicle capacity <br />Average vehicle speed m.p.h. <br />Maximum vehicle speed m.p.h. <br />No. of trips per day <br />Haul road silt content (i! knonn) <br />List controls for raw materials transport: <br />Proposed controls <br />from removal site to mine <br />No. of wheels <br />(cannot exceed 30 m.p.h) <br />_$ . <br />(sea mnaaurse listed above) <br />8 <br />