My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47393
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:22:24 PM
Creation date
11/23/2007 3:26:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
5/1/1999
Doc Name
DOCUMENTED QUOTE GRASSY GAP COAL MINE MAINTENANCE PROJECT PKA-9-XXX
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1~ <br />liability policy; <br />e. Certificates of insurance must be provided to the State within 10 working days after receipt of <br />Award; and, <br />f. Insurance shall include provision providing notification to the State 10 days prior to cancellation of <br />the coverage. <br />3. Automobile Liability (Minimum). The contractor must carry a minimum of $600,000 wmbined single limit <br />VENDOR OFFSET <br />Pursuant to C.R.S. 24-30-202.4 (as amended), the State Controller may withhold debts owed to state agencies <br />under the vendor offset intercept system for: (a) unpaid child support debt or child support arrearages; (b) unpaid <br />balance of tax, accrued interest, or other charges specified in Article 22, Title 39, C.R.S.; D unpaid loans due to the <br />student loan division of the Department of Higher Education; (d) owed amounts required to be paid to the <br />unemployment compensation fund; and (e) other unpaid debts owing to the State or any agency thereof, the amount <br />of which is found to be owing as a result of final agency determination or reduced to judgment as certified by the <br />controller. <br />Work Description <br />Maintenance work to be accomplished at the Grassy Gap Coal Mine includes construction of three (3) low water <br />crossings, repair of a sediment pond dewatering device and sealing of the vase of the same sediment pond. A few <br />miscellaneous tasks will be accomplished through the use of machine time. Maintenance of the Grassy Gap Mine is <br />being accomplished by the State of Colorado, Division of Minerals and Geology, using forfeited reclamation bond <br />monies. <br />The attached General Conditions /or Purchase Orders and Purchase Order Terms and Conditions apply to all work. <br />The Project is scheduled to be conducted during the week of June 28, 1999. It is anticipated that the project will be <br />accomplished in no more than four (4) consecutive working days. <br />The Grassy Gap Coal Mining operation was a permitted mining operation. The Colorado Mined Land Reclamation <br />Board has revoked the operating permit, and forfeited the reclamation bond. The majority of the site was reclaimed <br />by the coal mining company. The Division of Minerals and Geology periodically performs reclamation related <br />maintenance work at the site. Accomplishing the required maintenance will help to stabilize the site by providing for <br />control of snow melt and storm related run off, and by minimizing seepage from a sediment control pond located on a <br />hillside. <br />NOTE that Mobilization and Demobilization are not included as a separate line item. CONTRACTOR shall include <br />charges for these items, if any, in the prices bid for the tasks described below. No additional payment for <br />Mobilization and Demobilization will be made. <br />Task 1 Low Water Crossings <br />The goal of this Task is to manage drainage of water on two of the of the old haul roads. In order to accomplish this, <br />two (2) low water crossings are to be constructed within the Project Area, one on the Pit 4 Road, and one on the Pits <br />2 / 3 Road. <br />The Pit 4 Road low water crossing will be constructed immediately above the first switchback located on this road. <br />This crossing will serve to transport water from the north to the south side of the road, and into an existing drainage <br />swale. The other low water crossing will be constructed at the first switch back of the Pits 2l 3 Road. This low <br />
The URL can be used to link to this page
Your browser does not support the video tag.