My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47375
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:22:24 PM
Creation date
11/23/2007 3:25:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
General Documents
Doc Date
5/25/2000
Doc Name
PUBLIC HEARING NOTIFICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents Paae No. <br />1.0 Introduction 1 <br /> 1.1 Project Purpose 1 <br /> 1.2 Project Description I <br />2.0 Existing Couditious 1 <br /> 2.1 Existing Roadway System 1 <br /> 2.2 Existing Traffic Controls 5 <br />3.0 Proposed Couditious 5 <br /> 3.1 Proposed Roadway System& Site Access 5 <br /> 3.2 Site Trip Generation and Trip Distribution 5 <br /> 3.3 Trip Assignment 5 <br /> 3.4 Existing and Estimated 2003 Traffic 5 <br /> 3.5 Estimated 2003 Traffic Plus Site Generated Traffic 10 <br />4.0 Future Couditious ]0 <br /> 4.1 Estimated 2020 Future Background Traffic 10 <br /> 4.2 Total Estimated 2020 Future Traffic 10 <br />5.0 Traffic Operational Evaluation 10 <br /> 5.1 Existing Condition Level of Service ]0 <br /> 5.2 Estimated 2003 Base Condition Level of Service 14 <br /> 5.3 Estimated 2003 Future Traffic Plus Site Generated Traffic <br /> Level of Service 14 <br /> 5.4 Estimated 2020 Future Background Traffic Level of Service 15 <br /> 5.5 Estimated 2020 Total Future Traffic Level of Service 15 <br />6.0 Conclusions and Recommendations 16 <br /> 6.1 Conclusions 16 <br /> 6.2 Recommendations ]6 <br />Appendix <br />Figures <br />Figure 1.1 Study Area Map 2 <br />Figure 1.2 Existing Site Map 3 <br />Figure 1.3 Future 2003 Site Map 3 <br />Figure 2.1 Existing Lanes and Traffic Control 4 <br />Figure 3.1 Proposed Lanes and traffic control 6 <br />Figure 3.3 Peak Hour Trip Assignment 7 <br />Figure 3.4.1 Existing ADT & Peak Hour Traffic 8 <br />Figure 3.4.2 Estimated 2003 Peak Hour Background Traffic and ADT 9 <br />Figure 3.5 Estimated 2003 Traffic Plus Site Generated Traffic 11 <br />Figure 4.1 Estimated 2020 Peak Hour Background Traffic and ADT 12 <br />Figure 4.2 Estimated 2020 Traffic with Site Generated Traffic 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.