Laserfiche WebLink
._ _ • • <br />Mr. Larry Reschke -2- September 12, 1984 <br />4. As a result of pond expansion, certified drawings need to be <br />submitted showing a cross-section through the pond with elevations of <br />all discharge structures, and type of structure used. Calculations <br />need to be submitted showing appropriate sizing of the emergency <br />spillway to pass the 25 year 24 hour rainfall peak flow. A <br />stage-storage relationships graph should also be submitted for the pond. <br />If your have any questions, please contact me. <br />Sincerely, <br />1"-- <br />Dan Mathews <br />Reclamation Specialist <br />DM/yt <br />Doc. No. 4044 <br />