Laserfiche WebLink
<br /> <br />Memo to Dan Mathews - 2 - September 19, 1989 <br />2. Mr. Cox has been advised that, under no circumstances, can sediment be <br />allowed to accumulate above the primary outlet entrance. I suggest a <br />written caution to the operator. <br />3. Mr. Cox will revise the plans to portray 3H:14 embankment outslope <br />gradients. <br />4. Mr. Cox will clarify that cemented riprap is being used to protect the <br />emergency spillway against erosion. <br />5. Submittal of quarterly inspection reports will be verified in the revised <br />plan. <br />6. The incorrect Rule citation regarding pond construction will be corrected. <br />7. A sediment disposal plan will also be included. <br />8.. Mr. Cox verified that the operator indeed has an NPDES permit. <br />Let me know when you receive the final and revised submittal, <br />cc: Mike Savage <br />9782F/scg <br />