Peabody Coal Company has committed to annually monitoring the topography of <br />the reclaimed portions of the Seneca II Mine. Peabody Coal Company has <br />committed to notifying the Division if significant deviations in the proposed <br />post-mining topography are identified during the monitoring process. In <br />addition, Peabody Coal Company has committed to submitting this topographic <br />map, which will 6e generated by photogrametric methods, to the Division on an <br />annual basis. <br />Contemporaneous Reclamation <br />Peabody Coal Company has indicated in the application for permit renewal that <br />rough backfilling and grading at the Seneca II Mine will be completed within <br />180 days following coal removal and will not be more than four spoil ridges <br />behind the active pit. <br />With the continued acceptance of the above stipulation, the operation is in <br />compliance with the requirements of this section. <br />XVIII. <br />Non-Coal Processing Waste - Rul <br />Peabody Coal Company does not have any coal processing facilities at Seneca II <br />Mine since coal is direct hauled from the mine to the Hayden Power Plant. <br />Therefore, no coal processing waste will be generated. <br />Non-coal waste is buried in the solid waste disposal site of the Wadge West <br />Pit (Exhibit 12-2 ). Approximately twenty (20) feet of overburden was <br />backfilled into the bottom of this old pit prior to any waste disposal to <br />elevate the disposal area above the anticipated water table surface and <br />exposed coal seam. A minimum of eight (8) feet of overburden material will be <br />backfilled on top of the completed waste disposal site with durable rock <br />material placed in the drainage on the southwest side of the site to minimize <br />surface water erosion potential. The area will then be topsoiled and <br />reclaimed similar to other disturbed sites of Seneca II Mine. <br />The operation is in compliance with the requirements of this section. <br />XIX. Mine Facilities, Coal Handling Structures, Support Facilities - <br />Information pertaining to surface facilities at the Seneca II Mine is <br />presented in Volume II, Tab 12, pages 12-17 to 12-27 and in Exhibit 12-2 of <br />the permit renewal application. The facilities located at the Seneca II Mine <br />site include an office complex, equipment repair shop, truck wash facilities, <br />non-coal waste disposal area, and explosives storage facilities. <br />Coal is loaded into haul trucks at the active pit areas and hauled directly to <br />the Hayden Power Plant. Therefore, no coal handling facilities have been or <br />are proposed to be constructed at the mine. <br />The operation is in compliance with the requirements of this section. <br />-40- <br />