My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47047
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:21:44 PM
Creation date
11/23/2007 3:05:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
1/1/1985
Doc Name
PROPOSED DECISION and FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />OPERATIONAL MONITORING <br />A POINT OF SAMPLING THE SLURRY WATER UTILIZED IN THE OPERATION WILL <br />BE AGREED UPON COOPERATIVELY BETWEEN THE OPERATOR AND THE DIVISION. <br />THIS POINT WILL BE SAMPLED QUARTERLY FOR THE FIELD PARAMETERS AND <br />TWICE YEARLY FOR CHEMICAL PARAMETERS DESCRIBED ABOVE. <br />A DESCRIPTION AND MEASUREMENT OF INFLOWS {IF POSSIBLE) WILL BE <br />COMPILED IN THE ANNUAL REPORT. INFLOW MONITORING IS REQUIRED DURING <br />PORTAL DEVELOPMENT AND ON-GOING MINING. CONDUCTIVITY MEASUREMENTS OF <br />INFLOWS MUST BE MADE WHEN POSSIBLE. <br />A REPORT MUST BE COMPILED OF NPDES EFFLUENT REPORTS SUBMITTED TO THE <br />COLORADO DEPARTMENT OF HEALTH. <br />A REPORT MUST BE COMPILED OF ANNUAL WATER BALANCE INCLUDING ESTIMATED <br />CONSUMPTIVE USE IN ACRE-FEET AND A RECORD OF FLOW TO THE ALLUVIAL <br />VALLEY FLOOR DURING IRRIGATION SEASON, AND FLOW IN THE VULCAN DITCH. <br />A BRIEF SUMMARY MUST BE MADE BY THE OPERATOR OF AREAS WHERE MAJOR <br />WATER LOSSES MOST LIKELY OCCURED. <br />C. SURFACE WATER <br />THE SURFACE WATER MONITORING PROGRAM WILL CONSIST OF QUARTERLY <br />MONITORING OF FIELD PARAMETERS OF THE COLORADO RIVER DOWNSTREAM OF <br />THE PRESENT SAMPLING SITE CR-2. <br />Stipulation No. 4 <br />THE PERMITTEE MUST AT ALL TIMES SUPPLY ADEQUATE WATER FOR FLOOD <br />IRRIGATION OF THE ALLUVIAL VALLEY FLOOR BELOW THE VULCAN DITCH. IF, <br />AT ANY TIME DURING THE IRRIGATION SEASON (MAY, JUNE, JULY, AUGUST, <br />AND SEPTEMBER), THE FLOW IN THE VULCAN DITCH DROPS BELOW 1.6 CUBIC <br />FEET PER SECOND, THE PERMITTEE MUST RECEIVE DIVISION APPROVAL, BASED <br />ON A DEMONSTRATION THAT THE WATER IS NOT NECESSARY FOR IRRIGATION OF <br />THE AVF, BEFORE USING THE WATER IN THE MINING OPERATION. <br />Stipulation No. 5 <br />THE PERMITTEE SHALL REVISE THE PERMIT WITHIN 120 DAYS OF APPROVAL TO <br />REFLECT THE FOLLOWING REQUIREMENTS. IN THE CASE OF REQUIRED CHANGES, <br />BELOW, THE PERMITTEE MUST HAVE WRITTEN APPROVAL OF THE DIVISION PRIOR <br />TO THE STIPULATION BEING SATISFIED. <br />REVEGETATION PLAN <br />THE DIVISION IS SETTING A WOODY PLANT DENSITY STANDARD OF 1000 LIVE <br />STEMS/ACRE FOR THE REVEGETATION SUCCESS STANDARD FOR THE SAGEBRUSH <br />COMMUNITY. <br />
The URL can be used to link to this page
Your browser does not support the video tag.