My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47047
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:21:44 PM
Creation date
11/23/2007 3:05:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
1/1/1985
Doc Name
PROPOSED DECISION and FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-36- <br />Questions and concerns arose during the permit review regarding structure <br />locations, construction phasing, open coal storage, and conveyor <br />construction.' These issues have been adequately resolved through subsequent <br />submittals. <br />The proposed operation is in compliance with the requirements of this section. <br />XXI. Roads - Rules 2.05.3(3) and 4.03 <br />The Roads Section in Volume I, Section 4 and the Road Drainage Section in <br />Volume VI of the application were reviewed for compliance. <br />The applicant proposes to construct an access road to the surface facilities <br />which will be temporarily used as a haul road until the proposed railroad is <br />constructed; a haul road from the surface facilities area to the coal refuse <br />embankments; and several light use roads along the pipeline corridors, <br />transmission line corridor, and monitoring sites. <br />The applicant proposes to retain the access and haul roads as part of the post <br />mining land use. Since the access road is to be temporarily used as a haul <br />road, it must meet the standards of Rule 4.03.1 as a haul road. This includes <br />certification that the road has been constructed as designed. The applicant <br />has committed to certification of the access road following completion. <br />The designs of the access road meet all the requirements of Rule 4.03.1 for <br />drainage, grade, road cuts, and road embankments, with one exception. The <br />applicant has not completed a site specific structural and foundation analysis <br />to establish design standards for road embankment stability. Therefore, the <br />following information is necessary to verify that the road embankments will be <br />stable. <br />Stipulation No. 7 <br />PRIOR TO CONSTRUCTION OF THE ACCESS ROAD, THE APPLICANT MUST SUBMIT <br />SITE SPECIFIC DESIGN STANDARDS FOR EMBANKMENT STABILITY, FOR DIVISION <br />APPROVAL. THE ANALYSIS SHALL BE CONDUCTED IN CONFORMANCE WITH RULE <br />4.03.1(3)(d)(vii). THE DESIGN STANDARDS SHALL BE SUBMITTED AS A <br />REVISION TO THE PERMIT APPLICATION. <br />The applicant will use light-use roads to monitoring stations constructed <br />under an exploration plan approved by the Division. These roads are shown on <br />figures 4.2-3, 4.2-4, and 4.2-5. The road designs meet all the requirements <br />of Rule 4.03.3. These roads are planned to be left as part of the post-mining <br />land use as requested by the landowners. <br />With satisfactory resolution of the above stipulation, the proposed operation <br />will be in compliance with the requirements of this section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.