My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47028
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:21:36 PM
Creation date
11/23/2007 3:04:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
8/9/1993
Doc Name
AMENDMENT 1 TO BID RN-COAL MINES 8
From
DMG
To
ALL BIDDERS ON THE GEC ORPHAN PIT BOND REVOCATION PROJECT BID RN COAL MINES
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i -° <br />REVISED BID SCHEDULE (August 9, 1993) <br />G.E.C. - Orphan Pit - Bond Revocation Project <br />RN-COAL-MINES - 8 UNIT <br />ITEM DESCRIPTION QTY UNIT PRICE AMOUNT <br />1. Mobilization/Demobilization 1 Job NA <br />per spec ificatione <br />2. Pond Cleanout, per epecificatione <br />A. West Pit 1 Job NA <br />B. PORd A 1 JOb NA <br />3. Drainage Stabilization, <br /> per epecificatione <br /> A. Magpie Creek Diversion 1 Job NA <br /> B. Duck Pond Pit 1 Job NA <br /> C. West Pit Diversion 1 Job NA <br /> D. No Name Drainage (Task Removed) <br />4. Additional Drainage Stabilization <br /> (Task Removed from Bid Schedule) <br />5. General Earthwork, <br /> per specifications <br /> A. Orphan Pit 1 Job NA <br /> B. Duck Pond Pit 1 Job NA <br /> C. Tipple Pond 1 Job NA <br /> D. Gully Repair <br /> - G.E.C. West Pit 1 Job NA <br /> - Hastings Strip 1 Job NA <br /> - North Mine (Task Removed) <br />6. Topsoil Replacement, 1 Job NA <br /> per specifications <br />7. Revegetation including seedbed preparation, 1 Job NA <br /> delivery and application of fertilizer, <br /> straw mulch and seeding; <br /> per epecificatione. <br />8. Equipment Rental- Dozer CAT DBN or 285 HP 30 Hours <br /> equivalent with operator, if required <br />9. Additional Rip-Rap Material, if required 20 CY <br /> by PROJECT MANAGER <br /> GRAND TOTAL (Enter here and on Invitation and Bid Schedule) $_ <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.