Laserfiche WebLink
AMENDMENT NO. 1 <br />G.E.C. - ORPHAN PIT - COAL REVOCATION PROJECT <br />RN-COAL-MINES-8 <br />1. Special Conditions <br />Bidding Information- Time of Completion <br />The time of completion allowed for this project is hereby <br />extended an additional 13 days to a total period of 50 <br />calendar days after receipt of the Notice to Proceed. <br />Utilities <br />Utilities, both underground and above ground, may exist which <br />could affect construction work covered under this contract. <br />The CONTRACTOR is responsible for determining the nature and <br />locations of any and all utilities which could affect <br />construction work covered under this contract. The horizontal <br />and vertical locations of utilities may vary. Utilities <br />include the City of Florence Water Line, Energy Fuels Water <br />Line and Associated Well, and the Corley Ranch Water Line. <br />The CONTRACTOR is responsible for excavation and equipment <br />movement without damage to utilities. The CONTRACTOR assumes <br />all responsibility for damages to any utilities he causes <br />under this contract. <br />Proiect Work Specifications <br />Drainage Stabilization of No Name Drainage (TASK 3D) <br />Drainage Stabilization of No Name Drainage (TASK 3D) has been <br />removed from the Bid Schedule. Please see the enclosed new <br />Bid Schedule. <br />Additional Drainage Stabilization (TASK 4) <br />Additional Drainage Stabilization on Magpie Creek Above Pond <br />A has (Task 4) been removed from the Bid Schedule. Please see <br />the enclosed new Bid Schedule. <br />Gully Repair (TASK 5D) <br />Gully repair will only be conducted at the G.E.C. West Pit and <br />Hastings Strip Area. The North Mine gully repair work has be <br />removed from the Bid Schedule. Please see the enclosed new <br />Bid Schedule. <br />