Laserfiche WebLink
Introduction <br /> This document is the proposed decision of the Colorado Division of Minerals and Geology (the <br /> Division) to approve a Phase I bond release request for the Support Facilities at the Edna Mine, <br /> Permit No. C-80-001. This decision document has tour parts: 1) procedures and summary of the <br /> bond release process; 2) criteria and schedule for bond release; 3) observations and findings of the <br /> Division regarding compliance with the bond release requirements of the Colorado Surface Coal <br /> Mining Reclamation Act (Act) and Regulations promulgated thereunder; and 4) the Division's <br /> proposed decision on the bond release request. <br /> Detailed information about the review process can be found in the Act, and the Rules and <br /> Regulations of the Colorado Mined Reclamation Board for Coal Mining (Rules). All sections <br /> referenced within this document are contained within the Rules. Detailed information about the <br /> mining and reclamation operations can be found in the permit application on file at the Division <br /> offices, located at 1313 Sherman Street, Room 215 in Denver, Colorado. <br /> The Edna Mine is a reclaimed surface mine which was permitted and operated by the Pittsburgh & <br /> Midway Coal Mining Company(P&M). The ownership of the land for which bond release has been <br /> requested is private and federal. <br /> Edna Mine 1 Bond Release No.7 <br /> C-80-001 January 6,2000 <br />