Laserfiche WebLink
5. A listing of all buildings and structures with their appropriate <br />dimensions (length, width, height and type of construction) should <br />be included to more accurately determine demolition and removal <br />costs. <br />6. It was not indicated in the building demolition costs if the costs <br />for removing concrete foundations, footers, and floors were <br />included. <br />Reclamation Cost Summary <br />Direct Costs <br />A. Removal of structures 542,403.00 <br />B. Backfilling and grading <br /> 1. 22,000 LCY Animas Portal Scraper 7,182.00 <br /> D9-L 2,290.00 <br /> 2. 30,000 LCY Refuse to Scraper 14,341.00 <br /> Helen Portal D9-L 19,719.00 <br />C. Topsoil Replacement Scraper 2,664.00 <br /> D9-L 3,817.00 <br /> D9-L 5,089.00 <br /> Topsoil Cost 37,631.00 <br />D. Sealing Mine Openings 2,130.00 <br />E. Revegetation 30.6 acres X 573.3 3/acre 17,544.00 <br />F. Loadout Reclamation 16,770.00 <br />G. Mobilization/Demobilization 6,574.00 <br /> Total Direct Reclamation Costs 5195,503.00 <br />II. Indi rect Costs <br />A. Public Liability Insurance .82% 51,603.DD <br />B. Contractor Performance Bond .80% 1,564.00 <br />C. Job Superintendent 320 hrs X 53 2.05 hour 10,256.00 <br />D. Contractor's Profit 10% 19,550.00 <br />E. Engineering/Bid Spec/ 8,308.00 <br /> Contract Document Fees/4.25% <br />F. MLRD Project Management S20/hr x 32 hrs 640.00 <br />Total Indirect Costs 541,921.00 <br />Total Performance Bond 5238,731.00 <br />Based on the Division's calculations an increase in bond in the amount of <br />550,073 is required for completion of existing reclamation liabilities. <br />Any increase in future reclamation costs would require an additional <br />increase in the bond amount. <br />-6- <br />