Laserfiche WebLink
::: <br /> <br />• <br />1 The next application will be the Snyder Quarry, <br />2 77-210 for our record, and we need more information on the -- <br />3 It should include access roads, roads to mine as affected lands <br />4 limit permit to area of aurface.disturbance. The reclamation <br />5 plan should state that Castle Concrete brings to some other <br />6 use besides parkland, amphitheater, and so forth. This appears <br />7 to be speculative. It.should include thickness, aonrce of soil <br />8 and elope of berm, the 50-foot berm that is being put around <br />9 the front of the operation for a cover.. -: <br />10 How will phoapherous and fertilizer be incorpora <br />I1 It must be drilled. <br />12 What happens to water that ends up in this <br />13 quarry? Have a.bowl effect on this, <br />14 ': And $38,000 bond on the 27 acres prior to <br />15 adjustment for haul and access roads which they should include. <br />16 MR. SULLIVAN: Okay. Then, Jim, would you go <br />17 on with the other presantatioa that you have? But, first, <br />I8 you do recommend that this be continued? <br />19 1+1R, SCHDSIEDING: Yes, air. <br />20 FdR. SULLIVANS Okay. <br />21 MR, ttEIFttEAt You want the Pikeview nett, right? <br />22 MR. SULLIVANt Yes, please. <br />23 MR. SCHMIEDINGs The next one is Pikeview Quarry <br />24 For our records, this is 77-211, and the inadequacies weret <br />25 include access roads, old access roads, sediment pond areas, <br />?p <br />